DT Midstream’s LEAP Phase 2 pipeline expansion project reached an earlier-than-scheduled mechanical completion on Dec. 6, the company announced, meaning the 400 MMcf/d of new capacity on the line should be available on Jan. 1.
The LEAP pipeline is a 155-mile high-pressure lateral line that collects gas in a network from primarily the Louisiana side of the Haynesville Shale and delivers it to facilities on the Louisiana Gulf Coast. The line serves several petrochemical facilities, but the expansion will be available to support LNG export facilities under construction.
The company also completed its LEAP Phase 1 project ahead of schedule, opening it to service in September. The expansion added 300 MMcf/d of capacity on the line, which has been filled almost immediately, according to East Daley Analytics.
Phase 2 raises total LEAP capacity to 1.7 Bcf/d. DTM expects to start Phase 3, adding another 200 MMcf/d in the second half of 2024.
Recommended Reading
Quantum Capital’s View on AI: Lots of Benefits, Pain Points
2024-05-16 - The energy industry is lagging in the race to implement AI, but Sebastian Gass, CTO of Quantum Capital Group, offered a few solutions during Hart Energy’s 2024 SUPER DUG Conference & Expo.
AI Poised to Break Out of its Oilfield Niche
2024-04-11 - At the AI in Oil & Gas Conference in Houston, experts talked up the benefits artificial intelligence can provide to the downstream, midstream and upstream sectors, while assuring the audience humans will still run the show.
PGS Wins 3D Contract Offshore South Atlantic Margin
2024-04-08 - PGS said a Ramform Titan-class vessel is scheduled to commence mobilization in June.
TGS Commences Multiclient 3D Seismic Project Offshore Malaysia
2024-04-03 - TGS said the Ramform Sovereign survey vessel was dispatched to the Penyu Basin in March.
Going with the Flow: Universities, Operators Team on Flow Assurance Research
2024-03-05 - From Icy Waterfloods to Gas Lift Slugs, operators and researchers at Texas Tech University and the Colorado School of Mines are finding ways to optimize flow assurance, reduce costs and improve wells.