Arkoma Basin-Fayetteville Completion Produces 7.15 MMcf/d.
Drilling Activity Details
Faulkner
AR
United States
Drilling Activity Summary
Description
In Faulkner County, Ark., Southwestern Energy Co. completed an Arkoma Basin-Fayetteville well that initially flowed 7.15 MMcf of gas per day. The #12-8H5 Carney 8-11 is in Section 8-8n-11w and was horizontally drilled northward and bottomed in Section 5. It was tested at 5,524-9,951 ft following acid treatments and a 10-stage fracturing. The well was drilled to 10,013 ft and the true vertical depth is 5,023 ft. The Houston-based company completed two other horizontal Fayetteville gas wells on the pad in February 2011, #3-08H Carney 8-11 (5.45 MMcf of gas per day) and #4-08H Carney 8-11 (5.4 MMcf of gas per day).
In Faulkner County, Ark., Southwestern Energy Co. completed an Arkoma Basin-Fayetteville well that initially flowed 7.15 MMcf of gas per day. The #12-8H5 Carney 8-11 is in Section 8-8n-11w and was horizontally drilled northward and bottomed in Section 5. It was tested at 5,524-9,951 ft following acid treatments and a 10-stage fracturing. The well was drilled to 10,013 ft and the true vertical depth is 5,023 ft. The Houston-based company completed two other horizontal Fayetteville gas wells on the pad in February 2011, #3-08H Carney 8-11 (5.45 MMcf of gas per day) and #4-08H Carney 8-11 (5.4 MMcf of gas per day).