Austin Chalk Completion in Vernon Parish, La.: 1,824 bo, 5.4 MMcf/d.
Drilling Activity Details
Vernon
LA
United States
Drilling Activity Summary
Description
Prime Rock Resources has completed an Austin Chalk oil well in Vernon Parish, La. IHS Markit reported that #1 Crosby 10 flowed 1,824 bbl of 46° API crude and 5.4 MMcf of gas per day from fracture-treated perforations at 16,186-22,249 ft. Tested on a 40/64-inch choke, the flowing tubing pressure was 5,075 psi, the flowing casing pressure was 775 psi and the shut-in casing pressure was 7,406 psi. The Sugartown Field well is in Section 10-2s-6w, and it bottomed within 2 miles to the south in Section 32-2s-6w in neighboring Allen Parish. It was drilled to 22,360 ft (15,650 ft true vertical). The Midland, Texas-based company’s well was sidetracked out of an initial horizontal hole that was junked and abandoned at 14,901 ft.
Prime Rock Resources has completed an Austin Chalk oil well in Vernon Parish, La. IHS Markit reported that #1 Crosby 10 flowed 1,824 bbl of 46° API crude and 5.4 MMcf of gas per day from fracture-treated perforations at 16,186-22,249 ft. Tested on a 40/64-inch choke, the flowing tubing pressure was 5,075 psi, the flowing casing pressure was 775 psi and the shut-in casing pressure was 7,406 psi. The Sugartown Field well is in Section 10-2s-6w, and it bottomed within 2 miles to the south in Section 32-2s-6w in neighboring Allen Parish. It was drilled to 22,360 ft (15,650 ft true vertical). The Midland, Texas-based company’s well was sidetracked out of an initial horizontal hole that was junked and abandoned at 14,901 ft.