Cabot Oil & Gas Announces Results from Four Completions at Forwood Pad
Drilling Activity Details
Susquehanna
PA
United States
Drilling Activity Summary
Description
Four Susquehanna County, Pa., Marcellus Shale completions were announced by Houston-based Cabot Oil & Gas. The Lenox Field wells were drilled from a single pad in Section 1, Lenoxville 7.5 Quad, Lenox Township. The #10H Forwood E was drilled to 16,777 ft, 7,034 ft true vertical, and flowed 17 MMcf of gas per day with a shut-in casing pressure of 775 psi. Production is from perforations at 8,113-16,699 ft. The #6H Forwood E was drilled to 24,000 ft, 6,942 ft true vertical, and produced 32.2 MMcf of gas per day with a shut-in casing pressure of 1,200 psi and is producing from perforations at 7,964-23,930 ft. The #7H Forwood had a total depth of 13,082 ft and a true vertical depth of 7,452 ft and flowed 11.8 MMcf of gas per day with a shut-in casing pressure of 600 psi. Production is from a perforated zone between 7,721 ft and 13,006 ft. The #5H Forwood E was drilled to 16,133 ft, 7,498 ft true vertical, and initially flowed 23.4 MMcf of gas per day with a shut-in casing pressure of 950 psi. Production is from perforations at 7,477-16,056 ft.
Four Susquehanna County, Pa., Marcellus Shale completions were announced by Houston-based Cabot Oil & Gas. The Lenox Field wells were drilled from a single pad in Section 1, Lenoxville 7.5 Quad, Lenox Township. The #10H Forwood E was drilled to 16,777 ft, 7,034 ft true vertical, and flowed 17 MMcf of gas per day with a shut-in casing pressure of 775 psi. Production is from perforations at 8,113-16,699 ft. The #6H Forwood E was drilled to 24,000 ft, 6,942 ft true vertical, and produced 32.2 MMcf of gas per day with a shut-in casing pressure of 1,200 psi and is producing from perforations at 7,964-23,930 ft. The #7H Forwood had a total depth of 13,082 ft and a true vertical depth of 7,452 ft and flowed 11.8 MMcf of gas per day with a shut-in casing pressure of 600 psi. Production is from a perforated zone between 7,721 ft and 13,006 ft. The #5H Forwood E was drilled to 16,133 ft, 7,498 ft true vertical, and initially flowed 23.4 MMcf of gas per day with a shut-in casing pressure of 950 psi. Production is from perforations at 7,477-16,056 ft.