Campbell County, Wyo., Wells at Drillpad Flow from Niobrara, Mowry
Drilling Activity Details
Campbell
WY
United States
Drilling Activity Summary
Description
According to IHS Markit, EOG Resources Inc. reported the completion of two horizontal producers—one each in Niobrara and Mowry from a common drillpad in Section 10-41n-73w of Campbell County, Wyo. The #3-1023H Ballista initially flowed 1.172 Mbbl of oil, 3.973 MMcf of gas and 1.536 Mbbl of water daily from a lateral in Niobrara. It was drilled to the southeast to 20,996 ft (10,566 ft true vertical) at a bottomhole location in Section 23-41n-73w. It was tested on a 30/64-in. choke after 43-stage fracturing between 10,953 and 20,853 ft. The #4-1023H Ballista is a Mowry producer, and it flowed 426 bbl oil, 4.4 MMcf of gas and 2.76 Mbbl of water per day. Production from a lateral also drilled to the southeast to 22,721 ft (11,960 ft true vertical) and bottomed in Section 23-41n-73w. It was tested on a 26/64-in. choke after 50-stage fracturing between 12,641 and 22,553 ft. EOG’s headquarters are in Houston.
According to IHS Markit, EOG Resources Inc. reported the completion of two horizontal producers—one each in Niobrara and Mowry from a common drillpad in Section 10-41n-73w of Campbell County, Wyo. The #3-1023H Ballista initially flowed 1.172 Mbbl of oil, 3.973 MMcf of gas and 1.536 Mbbl of water daily from a lateral in Niobrara. It was drilled to the southeast to 20,996 ft (10,566 ft true vertical) at a bottomhole location in Section 23-41n-73w. It was tested on a 30/64-in. choke after 43-stage fracturing between 10,953 and 20,853 ft. The #4-1023H Ballista is a Mowry producer, and it flowed 426 bbl oil, 4.4 MMcf of gas and 2.76 Mbbl of water per day. Production from a lateral also drilled to the southeast to 22,721 ft (11,960 ft true vertical) and bottomed in Section 23-41n-73w. It was tested on a 26/64-in. choke after 50-stage fracturing between 12,641 and 22,553 ft. EOG’s headquarters are in Houston.