Canadian County, Okla., Completion Producing from Mississippi Lime
Drilling Activity Details
Locations
Canadian
OK
United States
Operators
Plays
Post Date
Shore Type
Well Name
#1MXH Johnny Bench 1108 11-14
Geo Coordinate
Drilling Activity Summary
Description
A Mississippi Lime discovery was announced by Camino Natural Resources in Canadian County, Okla. The #1MXH Johnny Bench 1108 11-14 is in Union City Field and was drilled in Section 11-11n-8w. It produced 323 bbl of 52-degree-gravity condensate, 4.211 MMcf of gas and 2,539 bbl of water per day from a perforated zone at 10,854-18,388 ft. Drilled to 18,458 ft (11,068 ft true vertical), it was tested on a 32/64-in. choke, and the flowing tubing pressure was 2,118 psi. Camino’s headquarters are in Denver.
Description
A Mississippi Lime discovery was announced by Camino Natural Resources in Canadian County, Okla. The #1MXH Johnny Bench 1108 11-14 is in Union City Field and was drilled in Section 11-11n-8w. It produced 323 bbl of 52-degree-gravity condensate, 4.211 MMcf of gas and 2,539 bbl of water per day from a perforated zone at 10,854-18,388 ft. Drilled to 18,458 ft (11,068 ft true vertical), it was tested on a 32/64-in. choke, and the flowing tubing pressure was 2,118 psi. Camino’s headquarters are in Denver.