Cement Field-Anadarko Basin Workover Producing from Springer Shale
Drilling Activity Details
Caddo
OK
United States
Drilling Activity Summary
Description
Results were announced by Stillwater, Okla.-based Territory Resources LLC from a Cement Field-Anadarko Basin workover. Located in Section 36-6n-10w of Caddo County, Okla., #2-36 Colonel initially flowed 5.65 MMcf of gas, 30 bbl and 2 bbl of water per day and was drilled to 13,950 ft. of 50-degree-gravity condensate and 8 bbl of water per day from Springer. It was tested on a 14/64-in. choke producing through untreated perforations at 11,798-11,818 ft with a shut-in tubing pressure of 8,381 psi and a flowing tubing pressure of 5,937 psi. Chesapeake Operating Inc. originally completed the well in five fracture-stimulated Springer intervals (79 net perforated ft) between 12,370 and 13,693 ft flowing 3.91 MMcf of gas, 1 bbl of condensate and 2 bbl of water per day; it was drilled to 13,950 ft.
Results were announced by Stillwater, Okla.-based Territory Resources LLC from a Cement Field-Anadarko Basin workover. Located in Section 36-6n-10w of Caddo County, Okla., #2-36 Colonel initially flowed 5.65 MMcf of gas, 30 bbl and 2 bbl of water per day and was drilled to 13,950 ft. of 50-degree-gravity condensate and 8 bbl of water per day from Springer. It was tested on a 14/64-in. choke producing through untreated perforations at 11,798-11,818 ft with a shut-in tubing pressure of 8,381 psi and a flowing tubing pressure of 5,937 psi. Chesapeake Operating Inc. originally completed the well in five fracture-stimulated Springer intervals (79 net perforated ft) between 12,370 and 13,693 ft flowing 3.91 MMcf of gas, 1 bbl of condensate and 2 bbl of water per day; it was drilled to 13,950 ft.