Citizen Energy Reports Results from Two Canadian County, Okla., Completions
Drilling Activity Details
Canadian
OK
United States
Drilling Activity Summary
Description
Two Union City Field-Woodford wells were completed at an Anadarko Basin pad in Canadian County, Okla. by Citizen Energy III. The pad is in Section 8-11n-8w. The #1H-8 Jensen flowed 94 bbl of 62° API condensate and 1.395 MMcf of gas per day from fracture-treated perforations at 12,380-17,380 ft. Gauged on a 14/64-inch choke, the flowing tubing pressure was 2,545 psi. Drilled to 17,481 ft, it bottomed about 1 mile to the south-southwest, and the proposed true vertical depth was 11,750 ft. The offsetting #2H-8-17 Jensen flowed 125 bbl of 59° API condensate and 1.817 MMcf of gas daily from perforations at 12,147-21,965 ft. the venture bottomed 2 miles to the south in nearby Section 17. It was tested on an 18/64-inch choke, and the flowing tubing pressure was 2,842 psi. The total depth is 22,065 ft, and the true vertical depth is 12,283 ft. Citizen’s headquarters are in Tulsa.
Two Union City Field-Woodford wells were completed at an Anadarko Basin pad in Canadian County, Okla. by Citizen Energy III. The pad is in Section 8-11n-8w. The #1H-8 Jensen flowed 94 bbl of 62° API condensate and 1.395 MMcf of gas per day from fracture-treated perforations at 12,380-17,380 ft. Gauged on a 14/64-inch choke, the flowing tubing pressure was 2,545 psi. Drilled to 17,481 ft, it bottomed about 1 mile to the south-southwest, and the proposed true vertical depth was 11,750 ft. The offsetting #2H-8-17 Jensen flowed 125 bbl of 59° API condensate and 1.817 MMcf of gas daily from perforations at 12,147-21,965 ft. the venture bottomed 2 miles to the south in nearby Section 17. It was tested on an 18/64-inch choke, and the flowing tubing pressure was 2,842 psi. The total depth is 22,065 ft, and the true vertical depth is 12,283 ft. Citizen’s headquarters are in Tulsa.