Delaware Basin Gas Completions By Capitan Energy Producing From Wolfcamp
Drilling Activity Details
Culberson
TX
United States
Drilling Activity Summary
Description
Capitan Energy Inc. announced two horizontal Wolfcamp gas producers in the Culberson County (RRC Dist. 8), Texas, portion of the Delaware Basin. The #2H Roxanne Fee 46 flowed 5.501 MMcf of gas, 1.223 Mbbl of 49.8-degree-grav-ity condensate and 3.677 Mbbl of water per day. Production is from acid- and fracture-stimulated perforations at 9,745-14,286 ft. It is in Section 46, Block 58 T2S, T&P RR Co Survey, A-2362. The horizontal Ford West Field producer bottomed about 1 mile to the south at 14,502 ft, 9,498 ft true vertical. Tested on a 36/64-in. choke, the flowing tubing pressure was 2,100 psi and was drilled about 3 miles to the southwest. The #2H James Fee 6 is in Section 5, Block 112, PSL Survey, A-1573. It initially produced 4.869 MMcf of gas, 993 bbl of 49.7-degree-gravity condensate and 4.869 Mbbl of water per day. Production is from fracture-treated perforations at 9,775-17,875 ft. Drilled to 18,098 ft, the true vertical depth is 9,353 ft with a 1.5 mile lateral that bottomed to the north. Tested on a 42/64-in. choke, the flowing tubing pressure was 1,300 psi. Capitan’s headquarters are in Carlsbad, N.M.
Capitan Energy Inc. announced two horizontal Wolfcamp gas producers in the Culberson County (RRC Dist. 8), Texas, portion of the Delaware Basin. The #2H Roxanne Fee 46 flowed 5.501 MMcf of gas, 1.223 Mbbl of 49.8-degree-grav-ity condensate and 3.677 Mbbl of water per day. Production is from acid- and fracture-stimulated perforations at 9,745-14,286 ft. It is in Section 46, Block 58 T2S, T&P RR Co Survey, A-2362. The horizontal Ford West Field producer bottomed about 1 mile to the south at 14,502 ft, 9,498 ft true vertical. Tested on a 36/64-in. choke, the flowing tubing pressure was 2,100 psi and was drilled about 3 miles to the southwest. The #2H James Fee 6 is in Section 5, Block 112, PSL Survey, A-1573. It initially produced 4.869 MMcf of gas, 993 bbl of 49.7-degree-gravity condensate and 4.869 Mbbl of water per day. Production is from fracture-treated perforations at 9,775-17,875 ft. Drilled to 18,098 ft, the true vertical depth is 9,353 ft with a 1.5 mile lateral that bottomed to the north. Tested on a 42/64-in. choke, the flowing tubing pressure was 1,300 psi. Capitan’s headquarters are in Carlsbad, N.M.