EOG Resources Announces Results from Two More Eagle Ford-Mangrove Pad
Drilling Activity Details
Gonzales
TX
United States
Drilling Activity Summary
Description
Two More Eagle Ford wells were completed at EOG Resources Inc.’s Mangrove pad in Gonzales County (RRC Dist. 1), Texas. The ventures were drilled in Jacob Dunbaugh Survey, A-199. The #6H Mangrove F was drilled to 20,982 ft (11,749 ft true vertical) and flowed 2,680 bbl of 43° API oil, 2.661 MMcf of gas and 2,150 bbl of water per day from perforations at 11,369-2,0874 ft. Tested on a 60/64-inch choke, the flowing tubing pressure was 113 psi and the shut-in casing pressure was 1,595 psi. The offsetting #9H Mangrove J was drilled to a total depth of 21,971 ft with a true vertical depth of 11,809 ft. It produced 2,328 bbl of 43° API oil, 2.376 MMcf of gas and 2,448 bbl of water per day. Production is from perforations at 11,439-21,884 ft. Gauged on a 40/64-inch choke, the flowing casing pressure was 1,700 psi.
Two More Eagle Ford wells were completed at EOG Resources Inc.’s Mangrove pad in Gonzales County (RRC Dist. 1), Texas. The ventures were drilled in Jacob Dunbaugh Survey, A-199. The #6H Mangrove F was drilled to 20,982 ft (11,749 ft true vertical) and flowed 2,680 bbl of 43° API oil, 2.661 MMcf of gas and 2,150 bbl of water per day from perforations at 11,369-2,0874 ft. Tested on a 60/64-inch choke, the flowing tubing pressure was 113 psi and the shut-in casing pressure was 1,595 psi. The offsetting #9H Mangrove J was drilled to a total depth of 21,971 ft with a true vertical depth of 11,809 ft. It produced 2,328 bbl of 43° API oil, 2.376 MMcf of gas and 2,448 bbl of water per day. Production is from perforations at 11,439-21,884 ft. Gauged on a 40/64-inch choke, the flowing casing pressure was 1,700 psi.