EOG Resources: Three Wolfcamp Wells at Loving County, Texas, Drillpad
Drilling Activity Details
Loving
TX
United States
Drilling Activity Summary
Description
IHS Markit reported that EOG Resources Inc. completed three horizontal Wolfcamp producers from a Phantom Field pad in Loving County (RRC Dist. 8), Texas. The pad is in Section 24, Block 55 T2S, T&P RR Co Survey, A-895. The #1H Link VJ Ranch 24-13 flowed 4.351 MMcf of gas, 1,217 bbl of 42.5-degree-gravity oil and 8,458 bbl of water per day. Production is from acid- and fracture-stimulated perforations at 11,510-21,451 ft. Gauged on a 1-inch choke, the shut-in tubing pressure was 517 psi. Drilled to 21,458 ft, the lateral bottomed 2 miles to the north at a true vertical depth of 11,154 ft in Section 13. The offsetting and parallel #2H Link VJ Ranch 24-13 B flowed 5.17 MMcf of gas, 1,563 bbl of 43-degree-gravity crude and 8,260 bbl of water daily from Wolfcamp at 11,435-21,627 ft. The 21,621 ft-well has a true vertical depth of 11,237 ft. The #3H Link VJ Ranch 24-13 C was drilled to 21,527 ft (11,200 ft true vertical). It initially flowed 6.276 MMcf, 1,849 bbl of 43-degree-gravity oil and 10,763 bbl of water from Wolfcamp at 11,625-21,527 ft.
IHS Markit reported that EOG Resources Inc. completed three horizontal Wolfcamp producers from a Phantom Field pad in Loving County (RRC Dist. 8), Texas. The pad is in Section 24, Block 55 T2S, T&P RR Co Survey, A-895. The #1H Link VJ Ranch 24-13 flowed 4.351 MMcf of gas, 1,217 bbl of 42.5-degree-gravity oil and 8,458 bbl of water per day. Production is from acid- and fracture-stimulated perforations at 11,510-21,451 ft. Gauged on a 1-inch choke, the shut-in tubing pressure was 517 psi. Drilled to 21,458 ft, the lateral bottomed 2 miles to the north at a true vertical depth of 11,154 ft in Section 13. The offsetting and parallel #2H Link VJ Ranch 24-13 B flowed 5.17 MMcf of gas, 1,563 bbl of 43-degree-gravity crude and 8,260 bbl of water daily from Wolfcamp at 11,435-21,627 ft. The 21,621 ft-well has a true vertical depth of 11,237 ft. The #3H Link VJ Ranch 24-13 C was drilled to 21,527 ft (11,200 ft true vertical). It initially flowed 6.276 MMcf, 1,849 bbl of 43-degree-gravity oil and 10,763 bbl of water from Wolfcamp at 11,625-21,527 ft.