Five Lower Spraberry Completions Reported at Martin County, Texas Drillpad
Drilling Activity Details
Martin
TX
United States
Drilling Activity Summary
Description
Five Lower Spraberry wells were completed by XTO Energy Inc. in the Spraberry Field portion of Martin County (RRC Dist. 8), Texas. The horizontal ventures were drilled from a pad in T&P RR Co Survey, A-776 The #3021SH Cassidy Unit 1 has a total depth of 19,532 ft and a true vertical depth of 8,067 ft. It was tested pumping 1,133 bbl of 40.7° API oil and 996,000 cu ft of gas per day from fractured perforations at 9,078 -19,396 ft. The #3022SH Cassidy Unit 1 was drilled to 19,469 ft (8,055 ft true vertical). It was tested flowing 1,192 bbl of 40° API oil and 807,000 cu ft of gas daily from perforations at 9,008-19,340 ft. The #3024SH Cassidy Unit 1 produced 848 bbl of 39.4° API oil and 729,000 cu ft of gas per day after fracturing. Production is from perforations at 9,102-19,444 ft. It was drilled to 19,546 ft, 8,067 ft true vertical. The #3062DH Cassidy Unit 1 was drilled to 19,880 ft, true vertical, 8,363 ft true vertical, and was kicked off at 7,753 ft. It was tested pumping 1,554 bbl of 40.7° API oil and 1.404 MMcf of gas per day from perforations at 9,434 ft-19,744 ft. The #3063DH Cassidy Unit 1 has a total depth of 19,659 ft and a true vertical depth of 8,365 ft. I pumped 1,313 bbl of 38.7° API oil with 1.236 MMcf of gas per day. Production is from perforations at 9,199 ft -19,522 ft.
Five Lower Spraberry wells were completed by XTO Energy Inc. in the Spraberry Field portion of Martin County (RRC Dist. 8), Texas. The horizontal ventures were drilled from a pad in T&P RR Co Survey, A-776 The #3021SH Cassidy Unit 1 has a total depth of 19,532 ft and a true vertical depth of 8,067 ft. It was tested pumping 1,133 bbl of 40.7° API oil and 996,000 cu ft of gas per day from fractured perforations at 9,078 -19,396 ft. The #3022SH Cassidy Unit 1 was drilled to 19,469 ft (8,055 ft true vertical). It was tested flowing 1,192 bbl of 40° API oil and 807,000 cu ft of gas daily from perforations at 9,008-19,340 ft. The #3024SH Cassidy Unit 1 produced 848 bbl of 39.4° API oil and 729,000 cu ft of gas per day after fracturing. Production is from perforations at 9,102-19,444 ft. It was drilled to 19,546 ft, 8,067 ft true vertical. The #3062DH Cassidy Unit 1 was drilled to 19,880 ft, true vertical, 8,363 ft true vertical, and was kicked off at 7,753 ft. It was tested pumping 1,554 bbl of 40.7° API oil and 1.404 MMcf of gas per day from perforations at 9,434 ft-19,744 ft. The #3063DH Cassidy Unit 1 has a total depth of 19,659 ft and a true vertical depth of 8,365 ft. I pumped 1,313 bbl of 38.7° API oil with 1.236 MMcf of gas per day. Production is from perforations at 9,199 ft -19,522 ft.