Five Marcellus Shale Wells Completed at Susquehanna County, Pa., Drillpad
Drilling Activity Details
Susquehanna
PA
United States
Drilling Activity Summary
Description
Cabot Oil & Gas Corp. announced results from five Marcellus Shale discoveries in Susquehanna County, Pa. The Dimock Field wells were drilled from a pad in Section 2, Hop Bottom 7.5 Quad, Brooklyn Township. The #6 Corbin J was tested after 57-stage fracturing flowing 30.3 MMcf of gas per day from perforations at 7,566-19,951 ft. Drilled to 20,027 ft, the true vertical depth is 6,653 ft. The #20 Corbin J was drilled to 20,293 ft, 6,902 ft true vertical, and produced 23.8 MMcf of gas per day from perforations at 8,729-20,215 ft after 53-stage fracturing. The #21 Corbin J has a total depth of 15,246 ft and a true vertical depth of 6,353 ft. It produced 16.7 MMcf of gas per day after 28-stage fracturing from perforations at 9,003-15,169 ft. The offsetting #23 Corbin J was tested after 59 stages of fracturing flowing 25.2 MMcf of gas per day from perforations at 9,384-22,010 ft. It was drilled to 22,098 ft, 7,398 ft true vertical, and tested after 59-stage fracturing. The #22 Corbin J was drilled to 14,370 ft with a true vertical depth of 7,090 ft. It was tested after 22-stage fracturing flowing 22 MMcf of gas per day from perforations at 9,452-14,297 ft. Cabot’s headquarters are in Houston.
Cabot Oil & Gas Corp. announced results from five Marcellus Shale discoveries in Susquehanna County, Pa. The Dimock Field wells were drilled from a pad in Section 2, Hop Bottom 7.5 Quad, Brooklyn Township. The #6 Corbin J was tested after 57-stage fracturing flowing 30.3 MMcf of gas per day from perforations at 7,566-19,951 ft. Drilled to 20,027 ft, the true vertical depth is 6,653 ft. The #20 Corbin J was drilled to 20,293 ft, 6,902 ft true vertical, and produced 23.8 MMcf of gas per day from perforations at 8,729-20,215 ft after 53-stage fracturing. The #21 Corbin J has a total depth of 15,246 ft and a true vertical depth of 6,353 ft. It produced 16.7 MMcf of gas per day after 28-stage fracturing from perforations at 9,003-15,169 ft. The offsetting #23 Corbin J was tested after 59 stages of fracturing flowing 25.2 MMcf of gas per day from perforations at 9,384-22,010 ft. It was drilled to 22,098 ft, 7,398 ft true vertical, and tested after 59-stage fracturing. The #22 Corbin J was drilled to 14,370 ft with a true vertical depth of 7,090 ft. It was tested after 22-stage fracturing flowing 22 MMcf of gas per day from perforations at 9,452-14,297 ft. Cabot’s headquarters are in Houston.