GEP Haynesville: Sligo Field Discovery in Bossier Parish, La
Drilling Activity Details
Bossier
LA
United States
Drilling Activity Summary
Description
In Bossier Parish, La., GEP Haynesville LLC announced a Haynesville Shale completion in Sligo Field. The #2-Alt KHL Minerals 16-21H initially flowed 25.074 MMcf of gas and 861 bbl of water per day from a fracture-treated zone at 11,261-18,096 ft. Tested on a 30/64-in. choke, the flowing casing pressure was 6,191 psi. The horizontal sidetrack was drilled to 18,170 ft (11,141 ft true vertical) in Section 16-17n-12w and bottomed more than 1 mile to the south in Section 21. The original hole was junked and abandoned at 4,605 ft. GEP is based in The Woodlands, Texas.
In Bossier Parish, La., GEP Haynesville LLC announced a Haynesville Shale completion in Sligo Field. The #2-Alt KHL Minerals 16-21H initially flowed 25.074 MMcf of gas and 861 bbl of water per day from a fracture-treated zone at 11,261-18,096 ft. Tested on a 30/64-in. choke, the flowing casing pressure was 6,191 psi. The horizontal sidetrack was drilled to 18,170 ft (11,141 ft true vertical) in Section 16-17n-12w and bottomed more than 1 mile to the south in Section 21. The original hole was junked and abandoned at 4,605 ft. GEP is based in The Woodlands, Texas.