Meramec Well Tested Flowing 10.6 MMcf Of Gas Per Day
Drilling Activity Details
Caddo
OK
United States
Drilling Activity Summary
Description
A horizontal Mississippian producer in Caddo County, Okla., flowed 10.6 MMcf of gas and 3.401 Mbbl of water per day. The Continental Resources Inc. completion, #1-14HM Vines is in Section 14-12n-13w. Production is from an acidized and fractured Meramec interval between 15,707 and 19,991 ft. It was tested on a 26/64-in. choke and the flowing tubing pressure was 6,180 psi and the shut-in tubing pressure was 10,064 psi. The Hydro Field venture was drilled to the north to 20,184 ft and a true vertical depth of 15,413 ft. Continental’s headquarters are in Oklahoma City.
A horizontal Mississippian producer in Caddo County, Okla., flowed 10.6 MMcf of gas and 3.401 Mbbl of water per day. The Continental Resources Inc. completion, #1-14HM Vines is in Section 14-12n-13w. Production is from an acidized and fractured Meramec interval between 15,707 and 19,991 ft. It was tested on a 26/64-in. choke and the flowing tubing pressure was 6,180 psi and the shut-in tubing pressure was 10,064 psi. The Hydro Field venture was drilled to the north to 20,184 ft and a true vertical depth of 15,413 ft. Continental’s headquarters are in Oklahoma City.