New Bossier Parish, La., Haynesville Producer in Sligo Field
Drilling Activity Details
Locations
Bossier
LA
United States
Operators
Post Date
Shore Type
Well Name
#1 Treat 14-23HC
Geo Coordinate
Drilling Activity Summary
Description
Aethon Energy Operating, based in Dallas, completed a Sligo Field-Haynesville Shale well. The #1 Treat 14-23HC is in Section 14-17n-12w in Bossier Parish, La. It was fractured in 80 stages and produced 15.504 MMcf of gas and 51 bbl of water daily. Drilled to 21,142 ft, the true vertical depth is 10,982 ft. It was tested on a 24/64-inch choke with a flowing casing pressure of 6,905 psi, and production is from perforations at 11,125-21,102 ft.
Description
Aethon Energy Operating, based in Dallas, completed a Sligo Field-Haynesville Shale well. The #1 Treat 14-23HC is in Section 14-17n-12w in Bossier Parish, La. It was fractured in 80 stages and produced 15.504 MMcf of gas and 51 bbl of water daily. Drilled to 21,142 ft, the true vertical depth is 10,982 ft. It was tested on a 24/64-inch choke with a flowing casing pressure of 6,905 psi, and production is from perforations at 11,125-21,102 ft.