New Des Moines Granite Wash Completion in Roberts County, Texas
Drilling Activity Details
Roberts
TX
United States
Drilling Activity Summary
Description
An Anadarko Basin well by Texakoma Exploration & Production had an initial flow rate of 481 bbl. of 42-degree-gravity oil, 1.14 million cu. ft. of gas and 71 bbl. of water per day. The Plano, Texas-based operator's #2 Crosby 8 is in Section 8, Block A-1, EL&RR Survey, A-780, of Roberts County (RRC Dist. 10), Texas. The well was tested on a 32/64-in. choke and the flowing tubing pressure was 250 psi. Production is from fracture-stimulated perforations in three intervals of an undisclosed formation at 8,588-94 ft., 8,640-46 ft. and 8,678-84 ft. with 250-psi flowing tubing pressure. Texakoma originally completed the 10,056-ft. vertical prospect flowing 23 bbl. of oil, 112,000 cu. ft. of gas and 18 bbl. of water daily from three Des Moines Granite Wash intervals between 9,244 and 9,650 ft. following fracture-stimulation.
An Anadarko Basin well by Texakoma Exploration & Production had an initial flow rate of 481 bbl. of 42-degree-gravity oil, 1.14 million cu. ft. of gas and 71 bbl. of water per day. The Plano, Texas-based operator's #2 Crosby 8 is in Section 8, Block A-1, EL&RR Survey, A-780, of Roberts County (RRC Dist. 10), Texas. The well was tested on a 32/64-in. choke and the flowing tubing pressure was 250 psi. Production is from fracture-stimulated perforations in three intervals of an undisclosed formation at 8,588-94 ft., 8,640-46 ft. and 8,678-84 ft. with 250-psi flowing tubing pressure. Texakoma originally completed the 10,056-ft. vertical prospect flowing 23 bbl. of oil, 112,000 cu. ft. of gas and 18 bbl. of water daily from three Des Moines Granite Wash intervals between 9,244 and 9,650 ft. following fracture-stimulation.