Offsetting Wolfcamp Producers Drilled in Delaware Basin Portion of Pecos County, Texas
Drilling Activity Details
Pecos
TX
United States
Drilling Activity Summary
Description
Two offsetting Wolfcamp completions were drilled by Denver-based Gary Permian LLC in the Delaware Basin of Pecos County (RRC Dist. 8), Texas. The #1H Stony produced 845 bbl of 41.9-degree-gravity crude, 1.025 MMcf of gas and 4.862 Mbbl of water per day from fracture-treated perforations at 8,781-17,252 ft. The flowing tubing pressure was gauged at 378 psi on a 32/64-in. choke. The Wolfbone Field well was drilled to 17,371 ft and is in Section 18, Block 118, T&STL RR Co Survey, A-5472. The well bottomed within 2 miles to the east in Section 2, Block 198, W.B. Tunnell Survey, A-5993. The true vertical depth is 8,308 ft. From the same pad, the parallel #1H Stony B flowed 736 bbl of oil, 565 Mcf of gas and 3.506 Mbbl of water per day from fracture-treated perforations at 8,247-16,848 ft. Tested on a 1-in. choke, the flowing tubing pressure was 250 psi. It was drilled to 17,022 ft with a true vertical depth of 8,017 ft.
Two offsetting Wolfcamp completions were drilled by Denver-based Gary Permian LLC in the Delaware Basin of Pecos County (RRC Dist. 8), Texas. The #1H Stony produced 845 bbl of 41.9-degree-gravity crude, 1.025 MMcf of gas and 4.862 Mbbl of water per day from fracture-treated perforations at 8,781-17,252 ft. The flowing tubing pressure was gauged at 378 psi on a 32/64-in. choke. The Wolfbone Field well was drilled to 17,371 ft and is in Section 18, Block 118, T&STL RR Co Survey, A-5472. The well bottomed within 2 miles to the east in Section 2, Block 198, W.B. Tunnell Survey, A-5993. The true vertical depth is 8,308 ft. From the same pad, the parallel #1H Stony B flowed 736 bbl of oil, 565 Mcf of gas and 3.506 Mbbl of water per day from fracture-treated perforations at 8,247-16,848 ft. Tested on a 1-in. choke, the flowing tubing pressure was 250 psi. It was drilled to 17,022 ft with a true vertical depth of 8,017 ft.