Real Energy Hits Multiple Gas Zones At Cooper Basin Test
Drilling Activity Details
Geo Coordinate
Drilling Activity Summary
Description
Real Energy Ltd. has announced results from fracture stimulation of its #1-Tamarama in the Queensland portion of the Cooper Basin. The venture was fractured in five stages in Toolachee and Patchawarra at approximately 2,300 m. The well hit 21 m of net sandstone gas pay (44 m gross) in Toolachee and 66 m of net sandstone gas pay (121 m gross) in Patchawarra. The venture is in Cooper Basin Block ATP927P. Additional testing, including flowback and gas testing, is underway. Real Energy is based in North Sydney.
Description
Real Energy Ltd. has announced results from fracture stimulation of its #1-Tamarama in the Queensland portion of the Cooper Basin. The venture was fractured in five stages in Toolachee and Patchawarra at approximately 2,300 m. The well hit 21 m of net sandstone gas pay (44 m gross) in Toolachee and 66 m of net sandstone gas pay (121 m gross) in Patchawarra. The venture is in Cooper Basin Block ATP927P. Additional testing, including flowback and gas testing, is underway. Real Energy is based in North Sydney.