Red Fork Completion by Blake Production in Oklahoma’s Noble County

Drilling Activity Details

Locations

Noble
OK
United States

Plays
Post Date
Shore Type
Well Name
#22-1-3 1HR Rissmann
Geo Coordinate

Drilling Activity Summary

Description

Blake Production Co. has completed the first horizontal Red Fork producer in Noble County, Okla. IHS Markit reported that #22-1-3 1HR Rissmann was tested on-pump for 106 bbl of 42° crude, 259 000 cu ft of gas and 1,173 bbl of water per day from fracture-treated perforations at 4,910-10,209 ft. The Otoe City Field completion is in Section 10-22n-1e. A sidetrack was drilled to 10,568 ft and bottomed about 1.5 miles to the north in Section 34-23n-1e with a true vertical depth of 4,627 ft. The well was originally completed by Dorado E&P Partners in mid-2013 pumping 17 bbl of oil, 137,000 cu ft of gas and 3,630 bbl of water per day from Mississippian at 4,990-9,667 ft. Blake’s headquarters are in Oklahoma City.