Senex Energy-Cooper Basin Well: 2 Mcfpd From Patchawarra
Drilling Activity Details
Drilling Activity Summary
Description
Senex Energy Ltd. announced that #1-Hornet in South Australia's Cooper Basin Permit PEL 115 produced more than 2 million cu. ft. per day after multizone fracture stimulation. The well was stimulated over the interval 2,484 to 2,678 meters, targeting the tight gas sands of Patchawarra. Two drillstem tests were conducted on the well with gas flowing to surface. Initial production testing and pressure monitoring at #1-Hornet are planned. Brisbane-based Senex is the operator of PEL115 and #1-Hornet with 80% interest with Orca Energy, holding the remaining 20%.
Senex Energy Ltd. announced that #1-Hornet in South Australia's Cooper Basin Permit PEL 115 produced more than 2 million cu. ft. per day after multizone fracture stimulation. The well was stimulated over the interval 2,484 to 2,678 meters, targeting the tight gas sands of Patchawarra. Two drillstem tests were conducted on the well with gas flowing to surface. Initial production testing and pressure monitoring at #1-Hornet are planned. Brisbane-based Senex is the operator of PEL115 and #1-Hornet with 80% interest with Orca Energy, holding the remaining 20%.