Strike Energy Schedules West Erregulla Ventures in Western Australia
Drilling Activity Details
WA
Australia
Drilling Activity Summary
Description
Strike Energy has secured a rig to drill #3 West Erregulla in Western Australia’s EP469 Joint Venture. The planned spud date is in the third quarter of 2020. After completion the rig will be moved to drill #4 West Erregulla and #5 West Erregulla. The two planned ventures are north of #2 West Erregulla, which was drilled to 5,017 m and encountered a 97-m gas column with a net pay of 41 m and porosities of up to 19%. Strike Energy, based in Thebarton, South Australia, is operator and holder of a 50% interest in a joint venture, with Warrego Energy holding the remaining interest.
Strike Energy has secured a rig to drill #3 West Erregulla in Western Australia’s EP469 Joint Venture. The planned spud date is in the third quarter of 2020. After completion the rig will be moved to drill #4 West Erregulla and #5 West Erregulla. The two planned ventures are north of #2 West Erregulla, which was drilled to 5,017 m and encountered a 97-m gas column with a net pay of 41 m and porosities of up to 19%. Strike Energy, based in Thebarton, South Australia, is operator and holder of a 50% interest in a joint venture, with Warrego Energy holding the remaining interest.