Tecolote Energy Reports Results From Two Marmaton Completions
Drilling Activity Details
TX
United States
Drilling Activity Summary
Description
Two horizontal Marmaton wells were competed by Tecolote Energy Operating LLC in the western Anadarko Basin in Hemphill County (RRC Dist. 10), Texas. The Tulsa-based company’s #2H Meadows-Clifford 31-30 MD EX is in Section 31, Block M-1, H&GN Survey, A-140. It was tested flowing 15.9 MMcf of gas, 218 bbl of condensate and 4.475 Mbbl of water per day. Production is from an acidized and fracture-stimulated in Marmaton D Granite Wash at 11,620-21,507 ft in a north lateral, which extends nearly 2 miles to 21,645 ft (11,394 ft true vertical). It bottomed in Section 30, A-1387 and was tested on a 48/64-in. choke with a shut-in tubing pressure of 2,635 psi and a flowing tubing pressure of 763 psi. About 30 ft east on the pad, #1H Meadows-Clifford 31-30 MD EX flowed 10.2 MMcf of gas, 437 bbl of condensate and 3.5 Mbbl of water. It was drilled to 19,419-ft, 11,640 ft true vertical. Production is from a treated, stacked wellbore drilled in Marmaton E at 11,859-19,269 ft. Tested on a 64/64-in. choke, the flowing tubing pressure was 1,639 psi and the shut-in pressure was 1,855 psi.
Two horizontal Marmaton wells were competed by Tecolote Energy Operating LLC in the western Anadarko Basin in Hemphill County (RRC Dist. 10), Texas. The Tulsa-based company’s #2H Meadows-Clifford 31-30 MD EX is in Section 31, Block M-1, H&GN Survey, A-140. It was tested flowing 15.9 MMcf of gas, 218 bbl of condensate and 4.475 Mbbl of water per day. Production is from an acidized and fracture-stimulated in Marmaton D Granite Wash at 11,620-21,507 ft in a north lateral, which extends nearly 2 miles to 21,645 ft (11,394 ft true vertical). It bottomed in Section 30, A-1387 and was tested on a 48/64-in. choke with a shut-in tubing pressure of 2,635 psi and a flowing tubing pressure of 763 psi. About 30 ft east on the pad, #1H Meadows-Clifford 31-30 MD EX flowed 10.2 MMcf of gas, 437 bbl of condensate and 3.5 Mbbl of water. It was drilled to 19,419-ft, 11,640 ft true vertical. Production is from a treated, stacked wellbore drilled in Marmaton E at 11,859-19,269 ft. Tested on a 64/64-in. choke, the flowing tubing pressure was 1,639 psi and the shut-in pressure was 1,855 psi.