Three Eagle Ford Producers Drilled at Frio County, Texas Pad
Drilling Activity Details
Frio
TX
United States
Drilling Activity Summary
Description
Ageron Energy, based in San Antonio, has completed three horizontal Eagle Ford oil wells from a drillpad in the Frio County (RRC Dist. 1), Texas, portion of Briscoe Ranch Field. The #1H Cyndi Unit initially flowed 840 bbl of 30.9° API crude and 117,000 cu ft of gas per day from fracture-treated perforations at 7,070-18,670 ft. Tested on an 11/64-inch choke, the flowing tubing pressure was 1,925 psi and flowing casing pressure was 850 psi. It was drilled to 18,794 ft (6,549 ft true vertical). The offsetting #2H Cyndi Unit flowed 984 bbl of 30.9° crude, 240,000 cu ft of gas and 240 bbl of water per day from a fracture-treated zone at 9,087-18,720 ft. It was drilled to 18,840 ft (6,444 ft true vertical). The #3H Cyndi Unit produced 984 bbl of crude, 266,000 cu ft of gas and 384 bbl of water from a fractured zone at 7,328-18,228 ft. The total depth is 18,344 ft, and the true vertical depth is 6,414 ft. The wells were drilled from offsetting surface locations in Ramona Urrugas Survey, A-645. The parallel horizontal laterals bottomed about 2.5 miles to the east-southeast. The #1H Cyndi Unit and #2H Cyndi Unit bottomed beneath the BS&F Survey, A-119, while #3H Cyndi Unit bottomed in BS&F Survey, A-1008.
Ageron Energy, based in San Antonio, has completed three horizontal Eagle Ford oil wells from a drillpad in the Frio County (RRC Dist. 1), Texas, portion of Briscoe Ranch Field. The #1H Cyndi Unit initially flowed 840 bbl of 30.9° API crude and 117,000 cu ft of gas per day from fracture-treated perforations at 7,070-18,670 ft. Tested on an 11/64-inch choke, the flowing tubing pressure was 1,925 psi and flowing casing pressure was 850 psi. It was drilled to 18,794 ft (6,549 ft true vertical). The offsetting #2H Cyndi Unit flowed 984 bbl of 30.9° crude, 240,000 cu ft of gas and 240 bbl of water per day from a fracture-treated zone at 9,087-18,720 ft. It was drilled to 18,840 ft (6,444 ft true vertical). The #3H Cyndi Unit produced 984 bbl of crude, 266,000 cu ft of gas and 384 bbl of water from a fractured zone at 7,328-18,228 ft. The total depth is 18,344 ft, and the true vertical depth is 6,414 ft. The wells were drilled from offsetting surface locations in Ramona Urrugas Survey, A-645. The parallel horizontal laterals bottomed about 2.5 miles to the east-southeast. The #1H Cyndi Unit and #2H Cyndi Unit bottomed beneath the BS&F Survey, A-119, while #3H Cyndi Unit bottomed in BS&F Survey, A-1008.