Three Eagle Ford Wells Completed by Marathon Oil in Atascosa County, Texas
Drilling Activity Details
Atascosa
TX
United States
Drilling Activity Summary
Description
Three Marathon Oil Corp. Eagle Ford wells were completed in Atascosa County (RRC Dist. 1), Texas. The wells were drilled from a single Eagleville Field pad in Section, 137 Fredrick Anthony Survey, A-15. The #2H Deatley Hollub May SA 2 was drilled to 21,420 ft (11,223 ft true vertical) and produced 2,428 bbl of 43.7° API oil, with 2.404 MMcf of gas and 989 bbl of water per day. It was tested on a 26/64-inch choke with a flowing casing pressure of 2,799 psi and production is from perforations at 10,828-21,298 ft. The #3H Deatley Hollub May SA 3 has a total depth of 20,909 ft and a true vertical depth of 11,171 ft. It was tested on a 26/64-inch choke flowing 2,255 bbl of 44° API oil, 2.153 MMcf of gas and no reported water per day from a perforated zone at 10,956-20,783 ft with a flowing tubing pressure of 2,860 psi. The #4H Deatley Hollub May SA 4 was drilled to 20,638 ft with no true vertical depth reported. It produced 1,957 bbl of 44° API oil, 1.976 MMcf of gas and 1,009 bbl of water per day from perforations at 10,909-20,525 ft. Gauged on a 26/64-inch choke, the flowing tubing pressure was 2,660 psi.
Three Marathon Oil Corp. Eagle Ford wells were completed in Atascosa County (RRC Dist. 1), Texas. The wells were drilled from a single Eagleville Field pad in Section, 137 Fredrick Anthony Survey, A-15. The #2H Deatley Hollub May SA 2 was drilled to 21,420 ft (11,223 ft true vertical) and produced 2,428 bbl of 43.7° API oil, with 2.404 MMcf of gas and 989 bbl of water per day. It was tested on a 26/64-inch choke with a flowing casing pressure of 2,799 psi and production is from perforations at 10,828-21,298 ft. The #3H Deatley Hollub May SA 3 has a total depth of 20,909 ft and a true vertical depth of 11,171 ft. It was tested on a 26/64-inch choke flowing 2,255 bbl of 44° API oil, 2.153 MMcf of gas and no reported water per day from a perforated zone at 10,956-20,783 ft with a flowing tubing pressure of 2,860 psi. The #4H Deatley Hollub May SA 4 was drilled to 20,638 ft with no true vertical depth reported. It produced 1,957 bbl of 44° API oil, 1.976 MMcf of gas and 1,009 bbl of water per day from perforations at 10,909-20,525 ft. Gauged on a 26/64-inch choke, the flowing tubing pressure was 2,660 psi.