Three Extended Lateral Cleveland Completions at Pad in Peek South Field
Drilling Activity Details
Ellis
OK
United States
Drilling Activity Summary
Description
In Ellis County, Okla., FourPoint Energy LLC has completed three extended-lateral Peek South Field wells in the Anadarko Basin. The Cleveland producers were drilled from a pad in Section 29-17n-23w.The #1S HA Spoonbill 20X17-17-23 was tested flowing 246,000 cu ft of gas, 203 bbl of 43-degree-gravity oil and 813 bbl of water per day from fracture-treated perforations at 10,165-20,322 ft. The flowing tubing pressure was 300 psi during testing on a 28/64-in. choke. It was drilled to 20,470 ft, 9,667 ft true vertical, and the lateral bottomed about 2 miles to the north in Section 16. About one-half mile to the east, the Oklahoma City-based company drilled two wells from offsetting surface locations. The #2HB Spoonbill 20X17-17-23 flowed 320,000 cu ft of gas, 182 bbl of oil and 1,253 bbl of water daily from perforations at 10,150-19,201 ft. It was drilled to the north to 20,441 ft (9,652 ft true vertical). The #3HC Spoonbill 20X17-17-23 initially flowed 354,000 cu ft of gas, 160 bbl of oil and 1,137 bbl of water per day from perforations at 10,175-20,324 ft. It was drilled to the north to 20,477 ft (9,666 ft true vertical).
In Ellis County, Okla., FourPoint Energy LLC has completed three extended-lateral Peek South Field wells in the Anadarko Basin. The Cleveland producers were drilled from a pad in Section 29-17n-23w.The #1S HA Spoonbill 20X17-17-23 was tested flowing 246,000 cu ft of gas, 203 bbl of 43-degree-gravity oil and 813 bbl of water per day from fracture-treated perforations at 10,165-20,322 ft. The flowing tubing pressure was 300 psi during testing on a 28/64-in. choke. It was drilled to 20,470 ft, 9,667 ft true vertical, and the lateral bottomed about 2 miles to the north in Section 16. About one-half mile to the east, the Oklahoma City-based company drilled two wells from offsetting surface locations. The #2HB Spoonbill 20X17-17-23 flowed 320,000 cu ft of gas, 182 bbl of oil and 1,253 bbl of water daily from perforations at 10,150-19,201 ft. It was drilled to the north to 20,441 ft (9,652 ft true vertical). The #3HC Spoonbill 20X17-17-23 initially flowed 354,000 cu ft of gas, 160 bbl of oil and 1,137 bbl of water per day from perforations at 10,175-20,324 ft. It was drilled to the north to 20,477 ft (9,666 ft true vertical).