Three Swan Lake Field-Haynesville Shale Wells Completed in Bossier Parish, La.
Drilling Activity Details
Bossier
LA
United States
Drilling Activity Summary
Description
Comstock Oil & Gas announced results from three Swan Lake Field-Haynesville wells completed in Bossier Parish, La. The Swan Lake Field wells were drilled from a single pad in Section 7-15n-10w. The #1-Alt Allums 7-6 was drilled to 21,727 ft with a true vertical depth of 13,000 ft. It produced 22.358 MMcf of gas per day. The offsetting #2-Alt Allums 7-6 initially flowed 21.971 MMcf of gas per day. It was drilled to 22,042 ft and the true vertical depth is 13,000 ft. The #7-6 HC 001-Alt Allums was drilled to 21,727 ft with a true vertical depth of 13,000 ft with a lateral length of 9,729 ft. It flowed 22.358.97 MMcf of gas per day. The offsetting #7-6 002-Alt-Allums was drilled to 22,042 ft, 13,000 ft true vertical, with a lateral length of 9,705 ft. It produced 21.97 MMcf of gas per day. Comstock’s headquarters are in Frisco, Texas.
Comstock Oil & Gas announced results from three Swan Lake Field-Haynesville wells completed in Bossier Parish, La. The Swan Lake Field wells were drilled from a single pad in Section 7-15n-10w. The #1-Alt Allums 7-6 was drilled to 21,727 ft with a true vertical depth of 13,000 ft. It produced 22.358 MMcf of gas per day. The offsetting #2-Alt Allums 7-6 initially flowed 21.971 MMcf of gas per day. It was drilled to 22,042 ft and the true vertical depth is 13,000 ft. The #7-6 HC 001-Alt Allums was drilled to 21,727 ft with a true vertical depth of 13,000 ft with a lateral length of 9,729 ft. It flowed 22.358.97 MMcf of gas per day. The offsetting #7-6 002-Alt-Allums was drilled to 22,042 ft, 13,000 ft true vertical, with a lateral length of 9,705 ft. It produced 21.97 MMcf of gas per day. Comstock’s headquarters are in Frisco, Texas.