Three Wolfcamp A Completions by XTO Energy in Martin County, Texas

Drilling Activity Details

Locations

Martin
TX
United States

Operators
Post Date
Shore Type
Well Name
#3063DH Cassidy Unit 1, #3011AH Cassidy Unit 1, #3012AH Cassidy Unit
Geo Coordinate

Drilling Activity Summary

Description

XTO Energy Inc. announced results from three Wolfcamp A completions in Spraberry Field. The wells were drilled from a pad in Martin County (RRC Dist. 8), Texas in T&P RR Co Survey, A-776. The #3063DH Cassidy Unit 1 was drilled to 19,659 ft (8,365 ft true vertical). It initially flowed 1,313 bbl of 38.7° API oil and 1.236 MMcf of gas per day. It is producing from perforations at 9,199-19,522 ft. The #3011AH Cassidy Unit 1 has a total depth of 20,040 ft and a true vertical depth of 8,674 ft. It was tested pumping 1,441 bbl of 38.7° API oil with 919,000 cu ft of gas per day from a perforated zone at 9,571-19,851 ft. The #3012AH Cassidy Unit was tested on gas lift flowing 972 bbl 40.7° API oil and 855,000 cu ft of gas per day. Production is from perforations at 9,592-19,914 ft. the well was drilled to 20,051 ft and the true vertical depth is 8,674 ft.