Two Bethany Longstreet Field-Haynesville Shale Completions In De Soto Parish, La.

Drilling Activity Details

Locations

De Soto
LA
United States

Plays
Post Date
Shore Type
Well Name
#1-Alt Loftus A 27&22 HC, #2-Alt Loftus A 27&22 HC
Geo Coordinate

Drilling Activity Summary

Description

In De Soto Parish, La., Goodrich Petroleum Co. announced results from two Bethany Longstreet Field-Haynesville Shale completions. The wells were drilled from a pad in Section 27-14n-16w. The #1-Alt Loftus A 27&22 HC was drilled to 20,500 ft, 11,800 ft true vertical, and bottomed in Section 22. It flowed 25.057 MMcf of gas 705 bbl of water per day. It was test on a 27/64-in.choke and the flowing casing pressure was 7,677 psi. Production is from perforations at 11,943-19,502 ft. The #2-Alt Loftus A 27&22 HC was drilled to 20,500 ft, 11,800 ft true vertical and it bottomed in Section 22 in a parallel lateral. It produced 25.857 MMcf of gas, 910 bbl of water from perforations at 11,932-19,611. Gauged on a 27/64-in. choke, the flowing casing pressure was 7,662 psi.