Two Bone Spring Wells Completed in Carlsbad Shelf
Drilling Activity Details
Lea
NM
United States
Drilling Activity Summary
Description
On the Carlsbad Shelf of the Permian Basin, Mewbourne Oil Co. has completed two horizontal Bone Spring oil wells from a pad in Lea County, N.M. according to IHS Markit, #001H Dolly Varden 25-24 B2ED State Com produced 500 bbl of crude, 1.578 MMcf of gas and 1.641 Mbbl of water daily after a 39-stage fracturing. Perforations are in Second Bone Spring at 10,533-17,940 ft. It was tested on a 21/64-in. choke and the flowing casing pressure was 1,350 psi. It is in Section 25-21s-34e and was drilled to 17,960 ft (10,210 ft true vertical). It bottomed within 1.5 miles to the north in Section 24. The shallower and parallel #002H Dolly Varden 25-24 B1ED State Com initially flowed 280 bbl of oil, 299 Mcf of gas and 2.833 Mbbl of water from First Bone Spring at 9,710-17,184 ft. It was fractured in 39 stages and tested on a 48/64-in. choke with a flowing casing pressure of 300 psi. Drilled to 17,205 ft, the true vertical depth is 9,475 ft.
On the Carlsbad Shelf of the Permian Basin, Mewbourne Oil Co. has completed two horizontal Bone Spring oil wells from a pad in Lea County, N.M. according to IHS Markit, #001H Dolly Varden 25-24 B2ED State Com produced 500 bbl of crude, 1.578 MMcf of gas and 1.641 Mbbl of water daily after a 39-stage fracturing. Perforations are in Second Bone Spring at 10,533-17,940 ft. It was tested on a 21/64-in. choke and the flowing casing pressure was 1,350 psi. It is in Section 25-21s-34e and was drilled to 17,960 ft (10,210 ft true vertical). It bottomed within 1.5 miles to the north in Section 24. The shallower and parallel #002H Dolly Varden 25-24 B1ED State Com initially flowed 280 bbl of oil, 299 Mcf of gas and 2.833 Mbbl of water from First Bone Spring at 9,710-17,184 ft. It was fractured in 39 stages and tested on a 48/64-in. choke with a flowing casing pressure of 300 psi. Drilled to 17,205 ft, the true vertical depth is 9,475 ft.