Two Offsetting Midland County, Texas, Wolfcamp Completions Announced
Drilling Activity Details
Midland
TX
United States
Drilling Activity Summary
Description
Two offsetting horizontal Wolfcamp wells in Midland County (RRC Dist. 8), Texas, were completed in the Midland Basin. Murchison Oil & Gas Inc. reported that #1HB Golladay was tested flowing 1.119 Mbbl of 42.2-degree-gravity crude, 1.099 MMcf of gas and 1.74 Mbbl of water per day from acid- and fracture-stimulated perforations at 9,385-16,140 ft. Gauged on a 42/64-in. choke, the flowing casing pressure was 460 psi. The new Spraberry Trend producer was drilled to 16,247 ft, or 9.453 ft true vertical, on a 989.7-acre lease in Section 47, Block 38 T2S, A.P. Veazey Survey, A-1058. The lateral bottomed within 1.5 miles to the southeast. The Dallas-based operator’s parallel #2HB Golladay flowed 1.114 Mbbl of 42.2-degree-gravity crude, 1.074 MMcf of gas and 1.756 Mbbl of water daily from treated perforations at 9,368-16,055 ft. Tested on a 42/64-in. choke, the flowing casing pressure was 370 psi. It was drilled to 6,155 ft, 9,443 ft true vertical. Murchinson’s headquarters are in Plano, Texas
Two offsetting horizontal Wolfcamp wells in Midland County (RRC Dist. 8), Texas, were completed in the Midland Basin. Murchison Oil & Gas Inc. reported that #1HB Golladay was tested flowing 1.119 Mbbl of 42.2-degree-gravity crude, 1.099 MMcf of gas and 1.74 Mbbl of water per day from acid- and fracture-stimulated perforations at 9,385-16,140 ft. Gauged on a 42/64-in. choke, the flowing casing pressure was 460 psi. The new Spraberry Trend producer was drilled to 16,247 ft, or 9.453 ft true vertical, on a 989.7-acre lease in Section 47, Block 38 T2S, A.P. Veazey Survey, A-1058. The lateral bottomed within 1.5 miles to the southeast. The Dallas-based operator’s parallel #2HB Golladay flowed 1.114 Mbbl of 42.2-degree-gravity crude, 1.074 MMcf of gas and 1.756 Mbbl of water daily from treated perforations at 9,368-16,055 ft. Tested on a 42/64-in. choke, the flowing casing pressure was 370 psi. It was drilled to 6,155 ft, 9,443 ft true vertical. Murchinson’s headquarters are in Plano, Texas