Two Woodbone Field Discoveries Drilled at Pad in Pecos County, Texas
Drilling Activity Details
Pecos
TX
United States
Drilling Activity Summary
Description
Two horizontal Wolfbone Field producers in Pecos County (RRC Dist. 8), Texas, were completed by Gordy Oil. The #1H Road King flowed 558 bbl of 42.7° API crude, 822,000 cu ft of gas and 5,517 bbl of water per day from acidized and fracture-stimulated Wolfcamp perforations at 8,601-19,200 ft. It was tested on a 58/64-inch choke and the flowing casing pressure was 745 psi. It was drilled on a 340-acre Delaware Basin lease in Section 526, Comanche Creek IRR Co Survey, A-39 to 19,306 ft (8,418 ft true vertical). It bottomed about 2 miles to the west in Section 1, Block 214, James McCollum Survey, A-4689. The offsetting, east-trending #1H Cross Bones flowed 800 bbl of 42.5° API oil, 468,000 cu ft of gas and 5,400 bbl of water daily from Wolfcamp perforations at 8,685-19,500 ft. Gauged on a 55/64-inch choke, the flowing casing pressure was 498 psi. The 2-mile lateral bottomed in Section 530, IRR&MFG Co Survey, A-1320 and was drilled to 19,606 ft (8,201 ft true vertical).
Two horizontal Wolfbone Field producers in Pecos County (RRC Dist. 8), Texas, were completed by Gordy Oil. The #1H Road King flowed 558 bbl of 42.7° API crude, 822,000 cu ft of gas and 5,517 bbl of water per day from acidized and fracture-stimulated Wolfcamp perforations at 8,601-19,200 ft. It was tested on a 58/64-inch choke and the flowing casing pressure was 745 psi. It was drilled on a 340-acre Delaware Basin lease in Section 526, Comanche Creek IRR Co Survey, A-39 to 19,306 ft (8,418 ft true vertical). It bottomed about 2 miles to the west in Section 1, Block 214, James McCollum Survey, A-4689. The offsetting, east-trending #1H Cross Bones flowed 800 bbl of 42.5° API oil, 468,000 cu ft of gas and 5,400 bbl of water daily from Wolfcamp perforations at 8,685-19,500 ft. Gauged on a 55/64-inch choke, the flowing casing pressure was 498 psi. The 2-mile lateral bottomed in Section 530, IRR&MFG Co Survey, A-1320 and was drilled to 19,606 ft (8,201 ft true vertical).