Wildcat Completed by Vermillion Energy in Campbell County, Wyo.
Drilling Activity Details
Locations
Campbell
WY
United States
Operators
Post Date
Shore Type
Well Name
#4471-09-1TH Rips
Geo Coordinate
Drilling Activity Summary
Description
Vermillion Energy completed a wildcat in Campbell County, Wyo. The #4471-09-1TH Rips was drilled in Section 16-44n-71w and was tested flowing 99 bbl of 37° API oil from Niobrara with no reported water per day after 29-stage fracturing. It was drilled to 14,959 and the true vertical depth was 8,736 ft with production from a perforated zone at 9,722-14,482 ft. Gauged on a 44/64-inch choke, the flowing tubing pressure was 178 psi and the flowing casing pressure was 89 psi. Vermillion’s headquarters are in Calgary.
Description
Vermillion Energy completed a wildcat in Campbell County, Wyo. The #4471-09-1TH Rips was drilled in Section 16-44n-71w and was tested flowing 99 bbl of 37° API oil from Niobrara with no reported water per day after 29-stage fracturing. It was drilled to 14,959 and the true vertical depth was 8,736 ft with production from a perforated zone at 9,722-14,482 ft. Gauged on a 44/64-inch choke, the flowing tubing pressure was 178 psi and the flowing casing pressure was 89 psi. Vermillion’s headquarters are in Calgary.