XTO Energy Completes Two Wolfcamp A Wells in Martin County, Texas
Drilling Activity Details
Martin
TX
United States
Drilling Activity Summary
Description
Two Wolfcamp wells were completed by XTO Energy Inc. Spraberry Field in Martin County (RRC Dist. 8), Texas. The Ty Field horizontal wells were drilled from a pad in T&P RR Co Survey, A-776. The #3011AH Cassidy Unit 1 was drilled to 20,040 ft, 8,674 ft true vertical, and was kicked off at 8,066 ft. It produced from Wolfcamp A perforations between 9,571 ft and 19,851 ft pumping 1,441 bbl of 38.7° API oil, and 919,000 cu ft of gas per day. The #3012AH Cassidy Unit 1 was drilled to 20,051 ft, 8,674 ft true vertical. It flowed 972 bbl of 40.7° API oil and 855,000 cu ft of gas daily from Wolfcamp A at 9,592 -19,914 ft.
Two Wolfcamp wells were completed by XTO Energy Inc. Spraberry Field in Martin County (RRC Dist. 8), Texas. The Ty Field horizontal wells were drilled from a pad in T&P RR Co Survey, A-776. The #3011AH Cassidy Unit 1 was drilled to 20,040 ft, 8,674 ft true vertical, and was kicked off at 8,066 ft. It produced from Wolfcamp A perforations between 9,571 ft and 19,851 ft pumping 1,441 bbl of 38.7° API oil, and 919,000 cu ft of gas per day. The #3012AH Cassidy Unit 1 was drilled to 20,051 ft, 8,674 ft true vertical. It flowed 972 bbl of 40.7° API oil and 855,000 cu ft of gas daily from Wolfcamp A at 9,592 -19,914 ft.