The historical account says that Jonah was in the belly of a whale for 3 days before he was freed. Pinnacle Technologies assisted BP in trying to free natural gas locked in its wells in Jonah for more than 65 million years!
The Jonah field is located in Sublette County, Wyo., approximately 70 miles (113 km) north of
![]() |
|
Figure 1. A plan view shows microseismic events for all stages mapped in the East Area including frac events and possible fault related events. (All graphics courtesy of Pinnacle Technologies) |
Sandstone bodies occur as individual 10-ft to 25-ft (3-m to 8-m) thick channels and stacked channel sequences greater than 200 ft (61 m) in some cases.
The main reservoir issues are low permeability and small pay sections across a large gross interval. Hydraulic fracturing is required to sustain commercial production in these low-permeability reservoirs, and wells in the Lance are stimulated in multiple fracture stages. Each fracture stage may target three to six sand bodies with eight to 12 stages per well. As in many fields in the Rocky Mountains, determining the optimum number of frac stages to effectively cover all of the thin pay intervals is very important.
The service company conducted microseismic and tiltmeter mapping to estimate fracture azimuth, fracture geometry, stage height coverage and fracture complexity on about 100 frac stages in two pilot areas (East and West). Results from the East area are presented here, and more detail on both areas can be found in SPE 102528, “Hydraulic Fracture Diagnostics Used to Optimize Development in the Jonah Field” by S.L. Wolhart, M.J. Mayerhofer and E.P. Lolan, Pinnacle Technologies; and T.A. Harting, J.E. Dahlem and T.J. Young, BP Americas.
Mapping results
Figure 1 shows the composite map view of the microseismic events for all 18 stages mapped
![]() |
|
Figure 2. A side view shows mapping results for EAST 3. |
Fault interaction
It appears that several treatments encountered faults or open natural fractures. Figure 1 shows a plan view for all stages mapped in East Area. Microseismic events considered to be fracture-related events and faults events are indicated on the map, showing three possible faults. These were imaged during stage 3 in EAST 4, stage 3 in EAST 3 and stage 3 in EAST 6. These were identified by the number of events generated, linear nature of these features and the event magnitudes compared to typical fracturing events. Surface seismic imaging did not detect these faults, but they are being integrated with 3-D seismic and local structure maps to better characterize the reservoir.
Figure 2 shows the map and side views of microseismic events for the EAST 3 (stages 3, 6, 7, 8 and 9), respectively. Created fracture half-lengths range from 700 ft to 1,100 ft (214 to 336 m), except for stage 9. The created fracture is assumed to be symmetric, with observation well location biasing results to the northwest. Fracture heights range from 150 ft to 350 ft (46 to 107 m), and out-of-zone growth appears to be common with overlap between stages.
Stage 3 grew very close to the observation well EAST 1, and this stage might have terminated at or near a fault. Stage 3 is well-contained within the target interval. Fracture
![]() |
|
Figure 3. Surface tiltmeter mapping shows results for all wells in the East Area project. |
Surface tiltmeter mapping results
Figure 3 shows fracture azimuths from surface tiltmeter mapping with a dominant azimuth in the north-westerly direction (N43°W on average). However, some stages had a strong northeasterly component. These were seen in the EAST 3 (stages 3 and 6), EAST 4 (stages 1 and 2), EAST 5 (stages 2 and 3) and EAST 6 (stage 3). These northeasterly components could indicate far-field fracture complexity. In summary, about 15% of treatments show a significant north-easterly fracturing component, indicating some degree of complex fracturing. The dominant fracture azimuth, however, is northwesterly, consistent with the microseismic mapping.
The results
The primary fracture azimuth is northwest-southeast for these two areas. The microseismic azimuth agrees with the primary azimuth determined from surface tiltmeters. Evidence of fracture complexity was seen with surface tiltmeters showing some fracture volume in the northeast direction. Analysis of microseismic data indicated that faults were encountered on several stages. Surface seismic imaging was not able to detect these faults, but they are now being integrated with 3-D seismic and local structure maps to better characterize the reservoir.
Fracture half-lengths varied from 300 ft to 1,100 ft for the East Area. The long fracture half-lengths and fracture direction could indicate the possibility for interference between wells placed along the north-westerly fracture azimuth at distances of 1,000 ft (305 m) or less.
Further production data analysis will also allow evaluation of effective fracture half-lengths and the tradeoff between tighter well spacing and larger treatment sizes. Measurements of fracture half-length and fracture azimuth can be used to more effectively select well locations to maximize recovery while minimizing well interference.
Fracture height was contained in some stages in both areas, but many stages had out-of- zone height growth with overlap between stages. This means the number of treatment stages can be reduced in some instances where sands are less than 100 ft (30.5 m) apart. A calibrated 3-D fracture model was built for use along with the mapping results to assist with future fracture staging and design. Fracture mapping provided the data necessary to determine future well spacing and placement as well as to optimize fracture design in these areas of the Jonah field.
Recommended Reading
E&P Highlights: Feb. 10, 2025
2025-02-10 - Here’s a roundup of the latest E&P headlines, from a Beetaloo well stimulated in Australia to new oil production in China.
E&P Highlights: Feb. 24, 2025
2025-02-24 - Here’s a roundup of the latest E&P headlines, from a sale of assets in the Gulf of Mexico to new production in the Bohai Sea.
E&P Highlights: Jan. 13, 2025
2025-01-13 - Here’s a roundup of the latest E&P headlines, including Chevron starting production from a platform in the Gulf of Mexico and several new products for pipelines.
E&P Highlights: Feb. 3, 2025
2025-02-03 - Here’s a roundup of the latest E&P headlines, from a forecast of rising global land rig activity to new contracts.
E&P Highlights: Jan. 27, 2025
2025-01-27 - Here’s a roundup of the latest E&P headlines including new drilling in the eastern Mediterranean and new contracts in Australia.