A new Compact Production Sampler, by using a through-wired design, allows a fullbore flowmeter be run at the bottom of a production logging string at the same time
as bottomhole samplers.
The system eliminates the need for separate wireline runs for logging and for fluid sample
![]() |
|
The Compact Production Sampler is a bottomhole reservoir fluid sampling tool that works for production logging applications, eliminating the need for a separate wireline run for reservoir fluid collection. (Graphic courtesy of Schlumberger) |
The tool is from 6.5 to 8.5 ft (2 to 2.5 m) long and can be integrated into any Schlumberger production logging operation. It can run in any position in the downhole logging assembly.
While going through field trials last year, the sampler passed a battery of tests, including collecting water samples for water injector tracer or resistivity analysis, gathering oil samples for pressure-volume-temperature (PVT) analysis and investigating plugs in the well bore.
The system’s ability to run the production log before taking the fluid samples allows selective fluid sampling at specific depths and the immediate investigation of anomalies in the fluid as logs identify them.
An operator can rely on tradition time delay or use the surface actuation on slickline using an electronic firing-head system. On some operations, such as a production logging tool operation on a single onshore well where the sample transfer and analysis are needed on site, the service company can run the sampler without the requirement for an on-site sampling specialist.
The sampler collects a 100 cc conventional bottomhole sample, and the chamber can be shipped directly to a laboratory for analysis. The chamber also has an integral agitation mechanism for use if the fluids require recombining at reservoir temperature and pressure before PVT analysis.
Recommended Reading
Segrist: Cooling the Reaction: Nuclear Makes Promising but Slow Comeback
2024-12-16 - Nuclear power is awesome. Nuclear power is also hard—and a long way off from displacing natural gas as the primary source for the electricity the U.S. will desperately need.
Dominion Energy Ups 5-Year Spending Plan to $50B
2025-02-12 - The higher planned capex guidance was delivered by Dominion Energy as power demand grows.
Energy Transition in Motion (Week of Feb. 14, 2025)
2025-02-14 - Here is a look at some of this week’s renewable energy news, including a geothermal drilling partnership.
Aalo Atomics Advancing Microreactor Tech for US Energy Needs
2025-01-08 - Aalo Atomics intends to build an experimental microreactor facility at the Idaho National Laboratory.
Microsoft Taps EDPR for Solar Power in Illinois, Texas
2025-02-10 - The three solar projects have a combined capacity of 400 megawatts, according to EDP Renewables North America.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.