Australian oil and gas company Otto Energy Ltd. is adding to its position along the Texas Gulf Coast.
According to recent company release, Otto agreed to participate in two exploration prospects located onshore Texas in Colorado and Lavaca counties. Participation in the two prospects, which will tests the regionally proven Wilcox play, is expected to cost Otto roughly $1.1 million, both to be funded from Otto’s existing cash reserves.
“Otto is excited to be participating in these two onshore prospects, which deliver limited cost exposure but excellent potential leverage to the current strong gas price environment,” Otto Energy Executive Chairman Mike Utsler commented in the release on Oct. 14. “Both prospects have strong associated liquids, and significant upside.”
Otto already has a portfolio of production, exploration and appraisal assets in the U.S. Gulf of Mexico, where the company exploration activities has led to the discovery of two of the 12 largest Gulf of Mexico and onshore fields, according to the company website. The company also holds an equity interest in Alaskan-focused oil and gas producer Pantheon Resources.
The prospects Otto recently acquired a participating interest include the Schindler Well in Colorado County and the Eaves Well in Lavaca. In addition to the Wilcox, the Eaves well will also test a shallow Yegua objective.
In the release, Otto said it assessed the Schindler Prospect as having unrisked mean success volumetrics of 21 Bcf of gas and 804,000 bbl of condensate at a 54% geological probability of success. The company projects that the Eaves Prospect has unrisked P50 success volumetrics of 2.5 Bcf of gas and 12,500 bbl of condensate at a 75% geological probability of success.
“We continue to screen a large number of opportunities against our targeted risk‐return evaluation framework,” Utsler added in the release.
Both wells are to be drilled on a “turn‐key” basis to minimize drilling cost exposure, according to the release, and are planned to be drilled during the fourth quarter of calendar year 2021. If successful, the wells will be completed and connected to nearby pipelines.
Recommended Reading
With Montney Production Set to Grow, US E&Ps Seize Opportunities
2024-10-02 - Canada’s Montney Shale play has already attracted U.S. companies Ovintiv, Murphy and ConocoPhillips while others, including private equity firms, continue to weigh their options.
Darbonne: The Geologic, the Man-made and the Political of Uinta Basin Outcrops
2024-10-01 - The oily western Uinta features layers of sedimentary deposits on view for visitors, mostly uninterrupted by man-made features but having an unseen pall of federal interference.
APA, TotalEnergies Aim for 'New Dawn' in Suriname with Massive GranMorgu Project
2024-10-01 - APA Corp. and TotalEnergies announced a $10.5 billion final investment decision for the GranMorgu project located offshore Suriname in Block 58. First production to come from a 220,000 bbl/d FPSO is slated to flow in 2028.
APA Corp., TotalEnergies Announce $10.5B FID on ‘Goliath’ Sized Deal Offshore Suriname
2024-10-01 - APA and TotalEnergies’ offshore Suriname GranMorgu development is estimated to hold recoverable reserves of more than 750 million barrels.
Now, the Uinta: Drillers are Taking Utah’s Oily Stacked Pay Horizontal, at Last
2024-10-01 - Recently unconstrained by new rail capacity, operators are now putting laterals into the oily, western side of this long-producing basin that comes with little associated gas and little water, making it compete with the Permian Basin.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.