Colonial Pipeline, the largest refined products pipeline operator in the United States, said on Jan. 14 it was responding to a report of a potential gasoline leak in Paulding County, Georgia and that one of its mainlines was temporarily shut down.
Crews were on the scene coordinating response efforts, the company said.
The pipeline that was shut was Line 1, which transports about 1.5 MMbbl/d of gasoline and runs from Houston, Texas, to Greensboro, North Carolina.
A Colonial spokesperson said the company did not have any information to share on a restart timeline.
However, gasoline traders said it is expected to be back in service later tonight.
"The timeline sounds on par with a best-case outcome," head of petroleum analysis at GasBuddy Patrick De Haan said, adding it suggests a minor leak and minimal environmental mitigation.
February RBOB gasoline futures RBc1 were up 0.56% to $2.1121 a gallon at 2:18 p.m. EST.
Colonial operates more than 5,500 miles (8,850 km) of pipeline and Line 1 is one of its two mainlines that connect Gulf Coast refineries with markets across the southern and eastern United States.
The U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA) did not immediately respond to a request for comment.
Paulding County Sheriff's Office said there was no notification to 911 regarding a gas leak.
RELATED
Recommended Reading
Then and Now: 4D Seismic Surveys Cut Costs, Increase Production
2025-03-16 - 4D seismic surveys allow operators to monitor changes in reservoirs over extended periods for more informed well placement decisions. Companies including SLB and MicroSeismic Inc. are already seeing the benefits of the tech.
Element Six, Master Drilling Announce Tunnel Development Partnership
2025-02-19 - Element Six and Master Drilling will deliver a diamond-enabled solution designed to increase tunneling development speed, reducing costs and minimize the environmental impact of tunnel construction.
No Drivers Necessary: Atlas RoboTrucks Haul Proppant, Sans Humans
2025-03-04 - Atlas Energy Solutions and Kodiak Robotics have teamed up to put two autonomous trucks to work in the Permian Basin. Many more are on the way.
PrePad Tosses Spreadsheets for Drilling Completions Simulation Models
2025-02-18 - Startup PrePad’s discrete-event simulation model condenses the dozens of variables in a drilling operation to optimize the economics of drilling and completions. Big names such as Devon Energy, Chevron Technology Ventures and Coterra Energy have taken notice.
Inside Prairie’s 11-Well Program in the D-J
2025-04-08 - Prairie Operating Co.’s 11-well program in the Denver-Julesburg Basin is drilling horizontal 2-milers with a Precision Drilling rig.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.