Time, the fourth dimension, has become a prominent element in field characterization and management. Historically, different technical disciplines marched to their individual tunes, some barely acknowledging the existence of the others, much less sharing information and collaborating on the development and exploitation of the company’s assets. But things are changing with the appearance of new technologies and the integration of different disciplines to provide more complete understandings of the dynamics of a field.
Companies are learning how they can use time-lapse information and real-time monitoring to
![]() |
|
Figure 1. 3-D Representation of the Mechanical Earth Model (MEM). (Images courtesy of Schlumberger) |
Historically used by individual disciplines to qualify sites for drilling or to help engineers design casing, completions or hydraulic stimulation programs, geomechanics was seen mostly as a tool for single-well applications. In fact, it provides a time map of the forces that have shaped the reservoir and will affect it in the future. In the hands of a skilled scientist or engineer, geomechanics can be used to determine the stresses and strains that have affected the reservoir throughout its life and will affect its performance in the years to come. Using such geomechanics information, engineers can plan wells to best access their reservoirs and reserves and can more effectively manage their field development and field management as well as mitigate risks associated with field operation. But, like any task with the potential to yield valuable results, the job is detailed and requires a meticulous approach.
Turning data into useful information
Schlumberger has been using geomechanics with great success in well planning, completion design and stimulation for several decades. Starting with wellbore stability modeling, geoscientists and engineers were able to make fast but effective studies of the formation structure surrounding the borehole, calculating safe and stable mud weights and evaluating potential drilling risk in terms of severity and likelihood of occurrence.
Another early application of oilfield geomechanics was hydraulic fracturing and stimulation. Engineers used log/rock properties correlations to design fracture treatments and estimate the extent of their propagation. Later, the techniques were expanded to address sand control and completions designs.
Years of meticulous laboratory testing of core samples in rock geomechanical laboratories
![]() |
|
Figure 2. Fault representations through active reservoir layers. |
Coupled geomechanics
The description of all the data relevant to geomechanics is the mechanical earth model. It is a consistent description of the earth stresses, pressures and rock mechanics properties through the reservoir and overburden, generated using all the information available from logs, geophysics, lab tests, drilling and field measurements. By coupling these models to reservoir and production simulations, geoscientists and engineers are able to not only analyze and design wells and completions but can also investigate the effects of production and injection and understand phenomena like subsidence or fault slippage that might affect both the reservoir and its surrounding rocks over the life of a field.
A real-world example
Recently, coupled reservoir modeling and geomechanics were used to understand and
![]() |
|
Figure 3. Plastic shear zones at horizontal well perforations. |
Simulating the effects of known past production, the model was advanced in time to compute stress rotations, stress changes, rock deformations and changes in reservoir properties, yielding a greatly improved history match to observed production. The model was checked against all relevant field and well observations to ensure conformation with the laws of physics and reality, and no data were discounted — every observation from the field required a supportable explanation. Major changes in the reservoir behavior and well
performance were identified as resulting from compaction and depletion-induced rock deformations. In the simulation, one well emerged as being particularly significant and a good indicator of some of the geomechanics effects occurring in the field. As the model was advanced with time, a concentration of shear stress was predicted in the Tor Chalk formation along that particular well path. Other studies had indicated a range of possible reservoir compactions of between 4.8 ft and 11.5 ft (1.45 m and 3.5 m) at current day following six years of production. The coupled VISAGE simulation, which employed the Norwegian Geotechnical Institute’s chalk failure criterion, removed most of this uncertainty and predicted that compaction in the Tor Chalk could only be 4.8 ft. In addition, the modeling not only constrained the compaction solution uncertainties but at the same time predicted that at that degree of compaction a well failure would occur within a few months. In fact, a major proppant and chalk influx was observed in that same well two months after it had been predicted. A 4-D seismic inversion validated the technique and results by indicating, at 4.9 ft (1.5 m), the same reservoir compaction as predicted by the VISAGE coupling.
What does it mean?
With coupled geomechanics modeling and analysis, companies can game-play the effects of production or stimulation alternatives to see which will best stand the test of time and which field development plan and well configurations are likely to mitigate potential geomechanics problems. With this more accurate predictability, companies can plan and execute remediation steps before catastrophic failure occurs. With the ability to peer into the future, field development wells can be placed more advantageously to optimize reservoir production over time. With improved accuracy and resolution, the effects of changes from implementing enhanced recovery techniques can be modeled, affecting the operator’s ability to successfully manage the reservoir for maximum profitability.
Recommended Reading
TGS Awarded Two More Streamer Contracts Offshore Norway
2025-02-10 - Data and intelligence TGS provider now has six contracts scheduled on the Norwegian Continental Shelf.
Classic Rock, New Wells: Permian Conventional Zones Gain Momentum
2024-12-02 - Spurned or simply ignored by the big publics, the Permian Basin’s conventional zones—the Central Basin Platform, Northwest Shelf and Eastern Shelf—remain playgrounds for independent producers.
DNO Discovers Oil in New Play Offshore Norway
2024-12-02 - DNO ASA estimated gross recoverable resources in the range of 27 MMboe to 57 MMboe.
Freshly Public New Era Touts Net-Zero NatGas Permian Data Centers
2024-12-11 - New Era Helium and Sharon AI have signed a letter of intent for a joint venture to develop and operate a 250-megawatt data center in the Permian Basin.
DNO Makes Another Norwegian North Sea Discovery
2024-12-17 - DNO ASA estimated gross recoverable resources in the range of 2 million to 13 million barrels of oil equivalent at its discovery on the Ringand prospect in the North Sea.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.