
(Source: CS Energy)
CS Energy and Calibrant Energy completed three stand-alone battery energy storage systems in Westchester County, New York, CS Energy announced Feb. 4.
The projects use Tesla’s MegaPack2XL technology to deliver 4.9 megawatts (MW), 4.2 MW and 4.3 MW to power their individual sites, which include a church, school and private property.
The systems will provide grid support for the state’s energy infrastructure during peak and seasonal demand periods.
Recommended Reading
CNOOC Makes Oil, Gas Discovery in Beibu Gulf Basin
2025-03-06 - CNOOC Ltd. said test results showed the well produces 13.2 MMcf/d and 800 bbl/d.
Sintana Reports Two Discoveries Offshore Namibia
2025-01-06 - Sintana Energy Inc. said the Mopane-2A well found gas condensate in one reservoir and light oil in a smaller one.
Oxy CEO: US Oil Production Likely to Peak Within Five Years
2025-03-11 - U.S. oil production will likely peak within the next five years or so, Oxy’s CEO Vicki Hollub said. But secondary and tertiary recovery methods, such as CO2 floods, could sustain U.S. output.
Analysis: Middle Three Forks Bench Holds Vast Untapped Oil Potential
2025-01-07 - Williston Basin operators have mostly landed laterals in the shallower upper Three Forks bench. But the deeper middle Three Forks contains hundreds of millions of barrels of oil yet to be recovered, North Dakota state researchers report.
Chevron Completes Farm-In Offshore Namibia
2025-02-11 - Chevron now has operatorship and 80% participating interest in Petroleum Exploration License 82 offshore Namibia.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.