With assets in Peru and Brazil, Australia’s Karoon has been progressing developments within South America’s oil and gas segment. Yet, Brazil is seen as a very strategic country for the company.
In 2017 Karoon expanded its presence in Latin America’s largest oil-producing country, acquiring its sixth block—S-M-1537—in the Santos Basin for about $6.3 million during Brazil’s 14th bidding round. The company has a decade of technical and operational experience in the southern Santos Basin with five blocks—S-M-1037, S-M-1101, S-M-1102, S-M-1165 and S-M-1166—acquired in the 9th bidding round.
“We always believed that Karoon’s first oil would be produced in Brazil,” Karoon South America General Manager Tim Hosking said.
The company’s activities in Brazil have been hot. Since 2013 Karoon has operated two drilling campaigns and a total of six wells, and it has made three oil discoveries: Echidna, Kangaroo and Bilby fields.
However, the company is making a big bet on the Echidna oil field.
“Echidna is a project that represents our future in the country with constant investment in research, analysis and professional training. This field is a milestone for us to constantly evaluate our progress in terms of strict environmental guidelines and prospects for productive development in the medium term,” Hosking said.
According to the manager, Karoon has been talking to different suppliers to contract the FPSO unit to be deployed in Echidna. “We believe [that] by the second half of 2018 we will have a final decision on this hiring,” he said. The field is expected to start producing oil by 2020. The amount of investment estimated for the field development plan is $300 million.
The development concept comprises two extended horizontal production wells and one gas injection well and a leased FPSO unit. Peak production is forecast to reach about 28,000 bbl/d.
Currently, the project is in the pre-development, engineering and basic design phase. The phase includes reservoir modeling, production scenario analysis, wellbore feasibility studies and development optimization.
In April 2017 Wood Group was awarded a multiyear contract from Karoon Petróleo & Gás to provide engineering services to support the full field development for the Echidna field offshore. According to the engineering services company, the partnership represents the first project between the two companies. The contract focuses on the technical requirements of a floating production unit (FPU) and subsea structures, and all bid package evaluations and execution phase. The equipped FPU will be located in the Echidna Field in the Santos Basin and moored in a maximum water depth of 400 m (1,312 ft).
Hosking also hailed Brazil’s current moment for investment opportunities in the country’s oil and gas industry. “Karoon has always believed in the potential of the offshore oil and gas market in Brazil. The company has observed the resumption of investments in the sector and significant advances in the decentralization of the segment, structuring new ANP [bidding] rounds with valuable assets and the growth of the national production,” he said. “Karoon wishes to be present in this historic scenario focused on generating value for the entire Brazilian oil and gas production chain.”
Brazil is a positive for the oil and gas industry, according to Hosking. He said the Brazilian government is making assertive moves to provide legal certainty and business stability for foreign investors.
Hosking said that the company eyes other opportunities in Brazil's oil and gas industry. “The development of the Brazilian market will be significant in the coming years. That’s why Karoon is looking for valuable assets across the country. As I said, we believe in the resumption of the national oil and gas segment. That is why we want to strengthen our presence in Brazil more and more,” he said.
This article originally appeared in Subsea Engineering News.
Recommended Reading
Natural Gas Storage Moves Closer to Average
2024-10-17 - Producers put 76 Bcf of natural gas into U.S. storage—a little less than market expectations—as the traditional storage season nears an end and prices continue to fall.
Marcellus Waiting to Exhale But Held Back by Regional, Economic Factors
2024-11-06 - After years of exploitation as one of the country’s first unconventional shale plays, the Marcellus still has plenty of natural gas for producers, even if regional and economic factors have kept much of it bottled up.
EIA Reports Natural Gas Storage Jumped 58 Bcf
2024-09-19 - The weekly storage report, released Sept. 19, showed a 58 Bcf increase from the week before, missing consensus market expectations of 53 Bcf, according to East Daley Analytics.
EPA Gives OK to Texas GulfLink Deepwater Port
2024-11-04 - Sentinel Midstream’s Texas GulfLink project is one of several proposals for an offshore oil terminal in the Gulf.
Analyst: Could Permian Gas Pipelines Fall Short of LNG Sweet Spot?
2024-09-23 - Permian Basin oil producers will be elated to see the Matterhorn Express and another planned pipeline move gas out of their way — but both will terminate east of the biggest LNG market in the world.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.