
A methane sensor. (Source: Shutterstock)
LongPath Technologies is expanding its methane sensing network in the Permian Basin with a significant portion of Vital Energy’s assets, the technology company said Sept. 26.
Colorado-based LongPath’s network includes towers equipped with laser transceivers that send out laser beams to detect methane emissions. Data is delivered in real-time via dashboards and customized alerts to field personnel.
“Cost-effective, durable options for oil and gas operators are the key to methane management asset-wide, or even basin-wide,” said LongPath Technologies CEO Ian Dickinson. “Expanding the LongPath methane sensing network in the Permian Basin is important since it will provide the emissions data necessary to support ultra-low methane energy production.”
Companies operating in the U.S. may face penalties if they don’t abide by federal rules aimed at reducing methane emissions.
The U.S. Environmental Protection Agency has set standards to lower emissions from high-emitting equipment, mandated monitoring of methane leaks from well sites and compressor stations and directed companies to eliminate routine flaring of natural gas produced by new oil wells. Plus, companies must switch to zero-emitting technologies and stop the use of natural gas-powered pneumatic controllers.
David Ferris, chief sustainability officer at Vital Energy, said the company believes LongPath’s methane monitoring system will “enhance revenue and mitigate regulatory risks.”
Oklahoma-headquartered Vital Energy has oil and gas properties in the Permian Basin of West Texas. The company, along with non-op E&P Northern Oil and Gas, recently closed on a $1.1 billion purchase of Delaware Basin assets from Point Energy Partners. The transaction was expected to add 68 gross (49 net) inventory locations for Vital.
Recommended Reading
Enchanted Rock’s Microgrids Pull Double Duty with Both Backup, Grid Support
2025-02-21 - Enchanted Rock’s natural gas-fired generators can start up with just a few seconds of notice to easily provide support for a stressed ERCOT grid.
ADNOC Contracts Flowserve to Supply Tech for CCS, EOR Project
2025-01-14 - Abu Dhabi National Oil Co. has contracted Flowserve Corp. for the supply of dry gas seal systems for EOR and a carbon capture project at its Habshan facility in the Middle East.
McDermott Completes Project for Shell Offshore in Gulf of Mexico
2025-03-05 - McDermott installed about 40 miles of pipelines and connections to Shell’s Whale platform.
US Drillers Cut Oil, Gas Rigs for First Time in Three Weeks
2025-03-28 - The oil and gas rig count fell by one to 592 in the week to March 28.
Equinor’s Norwegian Troll Gas Field Breaks Production Record
2025-01-06 - Equinor says its 2024 North Sea production hit a new high thanks to equipment upgrades and little downtime.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.