Production has started at the deepwater MJ Field in the Bay of Bengal offshore India, Reliance Industries Ltd. and BP announced June 30.
The MJ gas and condensate field is the third project in the Reliance-operated KG D6 Block that the partners are developing. Production from the R Cluster started in December 2020 with production at the Satellite Cluster following in April 2021.
Together, the three developments in the Krishna Godavari Basin are expected to send 30 MMcm/d, or 1 Bcf/d, to the Ruby FPSO once MJ achieves peak production. At its peak, production from the KG D6 block will account for a third of India’s domestic gas production.
Discovered in 2013 about 2,000 m directly below the currently producing Dhirubhai-1 and Dhirubhai-3 fields, MJ was sanctioned in 2019. The MJ field is in water depths of up to 1,200 m about 30 km from the onshore terminal at Gadimoga on the east coast of India. MJ, an HP/HT gas and condensate field, will have production from eight wells. Peak production at MJ is expected to reach 12 MMcm/d of gas and 25,000 bbl/d of condensate. The Ruby FPSO will process and separate the condensate, gas, water, and impurities, before sending the gas onshore for sale. Condensate is stored on the FPSO before offloading to shuttle tankers for supply to Indian refineries.
Reliance operates the KG D6 block with 66.67% interest on behalf of partner BP with 33.33% interest.
Recommended Reading
TotalEnergies Awards SBM Offshore FPSO GranMorgu Development Contract
2024-11-15 - SBM will construct and install a floating production, storage and offloading vessel for TotalEnergies alongside its partner Technip Energies, the company said.
TGS Extends Appalachian Basin 3D Seismic Survey
2024-10-23 - TGS said the survey, which is positioned up-dip from the Utica condensate and gas trend, will target 276 sq miles of “key” formations in the Appalachian Basin.
Petrobras Awards SLB Another Contract Offshore Brazil
2024-12-12 - Petrobras has awarded JV SLB OneSubsea a contract for raw water injection systems a day after Petrobras selected SLB to handle integrated services at its offshore fields.
Brazil’s Mero-3 Offshore Development Reaches First Oil
2024-10-30 - With the start-up of Mero-3, the production capacity of the Mero field has reached 590,000 bbl/d.
Baker Hughes to Supply Petrobras' Presalt Fields with Flexible Pipe Systems
2024-10-28 - Baker Hughes said the systems will look to address the issue of corrosion cracking from CO2, which can arise as gas is reinjected into wells.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.