In any well delivery operation there are three drivers—drilling efficiency, accurate well placement and high-quality wellbores.
The main objective in directional drilling is to accurately position the well within the target to optimize returns. Nevertheless, wellbore quality is just as important a factor that must be considered—a precisely placed well does not necessarily mean the wellbore itself is ideal for later completions. While placing high-integrity wells in the best locations, drillers must also strive for higher performance during operations, which entails getting to total depth faster with less flat time.
High-quality wells delivered ahead of plan can help operators see a positive impact not only on cost per foot, but also cost per barrel produced. Early production, efficient post-drilling operations and optimum field development plans are all affected by superior well construction.
Extended-reach drilling (ERD) services provide a solution to restricted reservoir production, enabling operators to more efficiently develop their assets by maximizing the exposure of the targeted intervals and eliminating the need for additional platforms.
For example, in the Middle East an operator was planning to drill an ERD well in a challenging high-temperature (HT) geological environment. As an additional challenge, the subsurface target was located beneath an urban area. In-depth prejob planning and risk assessments were conducted to design an integrated drilling system that included the PowerDrive VorteX rotary steerable system (RSS) to deliver high ROP, the PowerDrive Orbit RSS to drill an abrasive HT interval, logging while drilling (LWD) tools, drilling fluids, custom drill bits and hole-cleaning and surface logging services. The well was delivered within the planned time, with no HSE incidents, and fully within the planned subsurface targets. The well also set the record as the first and the deepest pre-Khuff HT well drilled by the operator.
Powered By Experience
Rotary steerable systems have evolved throughout the years to continuously improve upon key deliverables: accurate wellbore positioning, optimum borehole quality and maximum drilling efficiency. A wide offering of systems makes achieving all three possible—in multiple applications.
All of the Schlumberger PowerDrive RSSs share distinctive characteristics to achieve drilling objectives. Rotation and torque are fully transmitted throughout the body of the tool to eliminate dragging components and enable maximum drilling performance to the target depth. These features also allow optimum efficiency when pulling out of hole and deliver maximum well integrity for post-drilling operations.
The systems also measure inclination and azimuth close to the bit. This close proximity and measurement accuracy is critical in maintaining an accurate 3-D well trajectory while pushing for drilling performance to enable precise kickoff delivery. Another inherent feature is the downhole closed automation loops, which provide directional consistency during well construction. In a recent drilling operation in the North Sea, the PowerDrive Orbit RSS reached a target total depth of 950-m (3,116-ft) section in one run and helped avoid close-proximity wells. An average of 25 m/h while drilling the first 475 m (1,558 ft) of the section was also achieved despite stick/slip severity of 90% to100%.
More Power In More Places
While all RSSs seek to eliminate sliding and provide basic inclination measures, there are more factors to consider when choosing a system. With the variety of fully rotating designs, the technology should be selected to maximize performance for each application. This is why versatility is a key advantage. Different steering mechanisms match customer needs in the planning phase. They also meet any unexpected challenge during the execution of the drill plan.
The PowerDrive family comprises RSS for a host of applications, including operations that require extensive runs, high ROP drilling, vertical drilling and high dogleg severity. The latest member of the family, the PowerDrive Xcel RSS, was specifically designed to handle the challenges inherent during extended reach drilling, sidetracking and geostopping. The gyrosteering capability of the system enabled an operator offshore Brazil to sidetrack just 1 m (3 ft) below the casing shoe, achieve the full deviation from the pilot well after 16 m (52 ft), and build inclination from 82 degrees to 85 degrees with a dogleg severity of 5⅓ degrees/30 m (even greater than the planned 3½ degrees/ 30 m) despite magnetic interference caused by the 9⅝-in. casing.
Power For Ultimate Performance
With a quarter of a billion feet drilled around the globe, which is roughly twice the circumference of the Earth, the PowerDrive RSS is the most used RSS family in the world. Using these systems, operators have continually broken footage, measured depth and ROP records in North America, Latin America, the North Sea, Middle East, Asia Pacific and the Far East. The RSS family also holds the record for the top 12 longest wells in the world.
The PowerDrive family encompasses a range of directional drilling solutions, derived from expertise and proven success, applicable to any environment. It widens the operating envelope, placing power in the operator’s hands, increasing ROP and lowering costs, however challenging the conditions.
Recommended Reading
Biden-Led EPA Rolls Out Methane Fee Targeting Oil, Gas Emitters
2024-11-12 - Companies violating the new Environmental Protection Agency rules will start paying penalties next year based on methane emissions reported in calendar year 2024.
Exclusive: Trump Poised to Scrap Most Biden Climate Policies
2024-11-29 - From methane regulations and the LNG pause to scuttling environmental justice considerations, President-elect Donald Trump is likely to roll back Biden era energy policies, said Stephanie Noble, partner at Vinson & Elkins.
Belcher: Election Outcomes and Their Impacts on Future US Policy
2024-10-14 - Trump would back ‘energy dominance,’ while Harris would pursue a climate change agenda.
Trump Taps Ex-Congressman Zeldin to Run Environmental Protection Agency
2024-11-11 - U.S. President-elect Donald Trump said on Nov. 11 he will appoint Republican former Congressman Lee Zeldin, who frequently voted against legislation on green issues, to run the Environmental Protection Agency.
Electrification of Permian Faces a Problem: Not Enough Shock for the System
2024-11-21 - Permian Basin producers may have to wait years for Texas utilities to grow the grid.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.