Many oil and gas companies, when working in shale plays such as the Bakken, Niobrara, and Marcellus, find their hands are full managing production issues such as well spacing and depth, hydraulic fracturing design, water resources, and sustained gas production.
However, experience shows that in many cases it is navigating the social and environmental issues that separate successful operators from those who see their expenses and timelines grow.
Decisions made in the production arena have many impacts on social and environmental risks. For example, a well that is sited to access a prolific reservoir and has a surface location in a sensitive environment will typically result in project delays to accommodate needed permitting and mitigation.
Careful consideration of both production and social and environmental factors at the planning stages of a well can improve the return on investment.
This is particularly a concern in situations where the time remaining on a land lease is short and there is pressure to "produce it or lose it."
Experience shows that production risks and the social and environmental aspects of a project are interrelated. Failure to address any one of these aspects will likely cause unforeseen difficulties that can turn what might have been a profitable venture into a costly learning experience.
Production factors impact non-production risks
Many production considerations have direct and indirect impacts on the social, environmental, and regulatory risks associated with shale plays, all centering on water. These include:
- How the water is sourced – even in comparatively awater-rich Pennsylvania, there are potentially many competing uses for water;
- Transporting the water with many truck-loads, possibly over roads that were originally designed for horse-drawn traffic;
- Storing water onsite prior to use, whether in tanks or in-ground impoundments;
- Storing the produced water and managing risks to groundwater or surface water due to a release;
- Reusing water and the implications this may have on its utility for frac purposes;
- Treating flowback and produced water, possibly in public or commercial water treatment facilities, to the required standards before discharging it; and
- Disposing of water through deep-well injection and addressing the shortage of sites that are geologically suitable for injection.
A growing area of concern related to water has to do with reinjection. Even where the rock mass is suitable for this, there are often concerns about potentially induced seismic activity.

The network of natural fractures stimulated by hydraulic fracturing is constrained within the shale due to presence of the quenching layer. (Image courtesy of Golder Associates)
Publicity about earthquakes related to deep geothermal projects has raised concerns about earthquakes that might be associated with reinjection of produced water. A good understanding of the rock mass can help manage these risks as well as provide reassurance to stakeholders, including local residents and regulatory authorities.
Understanding existing fracture network
Knowledge of the fracture network helps determine:
- The financial risk involved by understanding how far the frac will extend, which is a factor in how much hydrocarbon resource can be extracted from a well;
- Optimal well spacing to maximize recoveries while minimizing the number of wells required;
- A wider range of options for the surface well location to avoid locations near inhabited areas or where there are vulnerable ecosystems such as wetlands;
- Optimal direction and depth of the producing leg of the well and trajectories;
- The amount of water that will be needed and how much will be produced; and
- Whether fractures can be expected to terminate due to a low stiffness layer and quenching fractures so these do not extend past the intended formations.
Transparent decision-making reduces conflict
The large water volume requirements of virtually all unconventional plays create interest among stakeholders, who have concerns that need to be addressed.
Good understanding of the reservoir itself and good decisions about water can help defuse potential conflicts. Fortunately, there have been many developments in the way decisions are made, taking into account the complex relations between production, social, and environmental issues.
Using tools such as triple bottom-line analyses helps improve decision-making from a production viewpoint – and it also helps demonstrate good stewardship to stakeholders, showing that the company is taking due precautions to manage potential risks.
In stakeholder meetings and presentations, it is helpful to clearly explain the decisions made in the way a project is designed, including the location of wells and how the water impacts will be managed.
Transparency goes a long way to answering stakeholder concerns and minimizing the potential for delays and increased expenses. By illustrating the data and analyses used in the decision-making process for resource development using visual/graphical tools that clearly present the data, a company can provide a more compelling communication tool than asking an already skeptical audience to simply trust that their concerns are being considered.
Recommended Reading
Artificial Lift Firm Flowco’s Stock Surges 23% in First-Day Trading
2025-01-22 - Shares for artificial lift specialist Flowco Holdings spiked 23% in their first day of trading. Flowco CEO Joe Bob Edwards told Hart Energy that the durability of artificial lift and production optimization stands out in the OFS space.
Utica’s Infinity Natural Resources Seeks $1.2B Valuation with IPO
2025-01-21 - Appalachian Basin oil and gas producer Infinity Natural Resources plans to sell 13.25 million shares at a public purchase price between $18 and $21 per share—the latest in a flurry of energy-focused IPOs.
Utica Oil’s Infinity IPO Values its Play at $48,000 per Boe/d
2025-01-30 - Private-equity-backed Infinity Natural Resources’ IPO pricing on Jan. 30 gives a first look into market valuation for Ohio’s new tight-oil Utica play. Public trading is to begin the morning of Jan. 31.
Q&A: Petrie Partners Co-Founder Offers the Private Equity Perspective
2025-02-19 - Applying veteran wisdom to the oil and gas finance landscape, trends for 2025 begin to emerge.
The Private Equity Puzzle: Rebuilding Portfolios After M&A Craze
2025-01-28 - In the Haynesville, Delaware and Utica, Post Oak Energy Capital is supporting companies determined to make a profitable footprint.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.