Knowledge about how to optimize a CO2 EOR project has grown dramatically in recent years as the number of active CO2 EOR floods worldwide has more than doubled, from 65 in the mid-’90s to more than 145 today. During this same time period, U.S. projects have increased from 55 to 130.
CO2 EOR’s growing popularity is due in large measure to its efficiency at “cleaning” oil from the rock. But since the properties of CO2 in the reservoir are such that overall “sweep” through the reservoir will likely be lower than during a waterflood, it is important to know that the CO2 is doing its job, contacting oil and moving it. And now that supplies of CO2 are constrained, the cost of CO2 for EOR projects is higher, and surveillance is even more important. Therefore, active reservoir management and ongoing pattern management is critical. This can only be achieved through an active, ongoing surveillance and optimization effort. Without such an effort, a CO2 flood’s performance can easily and quickly spiral out of control, and its profitability can suffer.
Surveillance
Surveillance operations can be grouped into two categories: routine and nonroutine. Routine surveillance is these basic data that are required to monitor and analyze the flood performance on a daily or monthly basis. It should have a reasonable cost associated with it and is part of the reservoir management team’s data gathering plans. It includes production well tests, injection rates and pressures, reservoir pressures, injection profiles, and corrosion.
Nonroutine surveillance is generally more focused on helping solve a specific problem. It also is likely more expensive. Examples of nonroutine surveillance include transient pressure analysis, production profile logs, borehole image logs, saturation logs, coring and special core analysis, and seismic methods.
Optimization
Several techniques can be applied to minimize the adverse sweep. Water-alternating-gas (WAG) management is the most widely used sweep control technique used for CO2 EOR projects. WAG management refers to the selection of the optimum WAG ratio and cycle slug sizes for each injector in the project.
The process requires the analysis of the surveillance data obtained, the development of recommendations based on the analysis and the implementation of those recommendations. Important considerations include the incremental oil production and gas production as well as facility constraints such as gas recycling capacity.
Both increasing the WAG ratios (tapering) and reducing the cycle sizes can improve the sweep and, with it, the CO2 utilization (the amount of CO2 needed to produce an incremental barrel of oil). They also can both result in more optimal CO2 retention and therefore help reduce the gas production rate. Reduced half-cycle sizes have the additional benefit of a higher CO2 processing rate and a reduced fluctuation in produced rates that are inherent with the WAG process.
We never know enough about a reservoir to expect a pre-deployment reservoir management plan to be perfect. As a result, CO2 miscible floods are often complex to manage. It is imperative that operators of such floods dedicate the needed talent and resources to do the proper surveillance and analysis to optimize flood performance and flood profitability.
Recommended Reading
Exxon, Chevron Beat 3Q Estimates, Output Boosts Results
2024-11-01 - Oil giants Chevron and Exxon Mobil reported mixed results for the third quarter, with both companies surpassing Wall Street expectations despite facing different challenges.
OMS Energy Files for IPO, Reports Revenue Growth
2024-11-06 - Singapore-based OMS Energy, a wellhead system manufacturer, has not yet determined its price range and number of shares.
Mexico Pacific Working with Financial Advisers to Secure Saguaro LNG I FID
2024-10-23 - Mexico Pacific is working with MUFG, Santander and JP Morgan to arrange the financing needed to support FID and the anchor phase of Saguaro Energía LNG.
Record NGL Volumes Earn Targa $1.07B in Profits in 3Q
2024-11-06 - Targa Resources reported record NGL transportation and fractionation volumes in the Permian Basin, where associated natural gas production continues to rise.
After BKV’s IPO, Is Market Open to More Public SMID Caps?
2024-10-03 - The market for new E&P and energy IPOs has been tepid since the COVID-19 pandemic. But investor appetite is growing for new small- and mid-sized energy IPOs, says Citigroup Managing Director Dylan Tornay.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.