![Trio Petroleum to Increase Monterey County Oil Production](/sites/default/files/styles/hart_news_article_image_640/public/image/2024/04/trio-petroleum-salinas-project.jpeg?itok=sGHhHHz2)
Trio's HV-3A discovery well at the Presidents Field prospect in the South Salinas Project. (Source: Trio Petroleum)
Trio Petroleum Corp. provided operational updates on its Presidents and McCool Ranch fields in Monterey County, California, according to an April 11 press release.
On March 26, Trio brought the HV-3A well in the Presidents Field, a part of the South Salinas Project, back into full-time production.
The company said oil production on the well averages 30 bbl/d and is producing from 125 ft of perforations in the Yellow Zone and upper Monterey Clay each.
Trio believes that production at HV-3A can increase through low-cost investments such as perforating up to 650 ft in the currently producing oil zones and opening already perforated deeper behind-pipe oil zones, acidizing the well for borehole cleanup.
The company’s geological team estimates that there are up to 50 additional developmental well locations in Presidents Field at 40-acre well spacing.
At McCool Ranch, Trio is operating the HH-1 well, which is producing approximately 45 bbl/d of oil. Based on the well’s production results, the company plans to add more shut-in oil wells in the field.
The 35X well, located in McCool Ranch, returned to production this month, while the 58X well is in the final stages of being brought back online after receiving a heat treatment, Trio said.
“Bringing these wells back online and taking the necessary steps to permit permanent production sets the stage for an expanded drilling program in these fields,” said Trio CEO Michael Peterson. “We correctly identified these assets from a geological perspective, we drilled successful multiple test wells. Now we want to take the logical next steps in extracting value from these assets.”
The HH-1 well and the HV-3A well collectively produce about 75 bbl/d and volumes are expected to increase as the 35X and 58X wells resume full time.
Recommended Reading
Kissler: Are We Set Up for a Summer Natural Gas Rally?
2024-07-02 - A warmer-than-normal season could jolt prices.
Wood Awarded Concept Study for Greater Sunrise Development
2024-07-02 - Wood said the study is on target for completion by fourth quarter 2024.: Wood said the study is on target for completion by fourth quarter 2024.
Solar Cell Maker Toyo, Blue World, Vietnam Sunergy Complete Merger
2024-07-02 - The newly combined solar company is expected to trade on the Nasdaq stock exchange under the ticker symbol TOYO.
Glenfarne: HOAs Commit More than Half of Texas LNG Plant Capacity
2024-07-02 - Glenfarne Energy Transition said a new, nonbinding agreement has committed half of the Texas LNG Brownsville plant's 4 million tons/year capacity.
Seeing is Believing: Fiber Optics for CO2 Storage Monitoring
2024-07-02 - Fiber optic systems can offer CO2 plume insights in CCS applications, according to services company Weatherford.