Titan Torque Services has developed a new piece of drilling installation equipment designed to enhance operational safety and performance using a technology-led approach to pre-make and install liner and casing hanger running tools.

The Push Pull Unit is the latest addition to Titan’s service portfolio, which focuses on pre-made drilling assemblies and drill bit protection equipment. (Image courtesy of Titan Torque Services)
The company says its Push Pull Unit has been specially designed to put the running tool in place in a process that is more controlled and measurable than existing industry techniques.
The hydraulically controlled 75-ft (23-m) unit can carry an assembly of up to 20 tons. It has a pull capability of 12 tons and push capability of 15 tons. The unit also can install liner/casing from 4.5 to 36 in. and digitally measures and records the forces deployed.
www.titantorque.co.uk ?
Recommended Reading
California Resources Advances California’s First CCS Project
2025-01-06 - California Resources Corp. will invest between $14 million and $18 million to capture the CO2, the company said in a news release.
Exxon Mobil Targets $2B More Earnings from Low Carbon Solutions
2024-12-17 - Exxon Mobil executives say the pace of growth for areas such as CCS, hydrogen and lithium vary due to uncertainty.
BKV Reaches FID, Forms Midstream Partnership for Eagle Ford CCS Project
2025-02-13 - If all required permits are secured, BKV’s CCS project in the Eagle Ford Shale will begin full operations in first-quarter 2026, the Barnett natural gas producer says.
API’s Multi-Pronged Approach to Lower Carbon Operations
2025-01-28 - API has published nearly 100 standards addressing environmental performance and emissions reduction, which are constantly reviewed to support low carbon operations without compromising U.S. energy security.
SLB Capturi Completes First Industrial-Scale CCS Facility
2024-12-03 - SLB Capturi, a JV between SLB and Aker Carbon Capture, said it had reached a milestone with the world’s first industrial-scale carbon capture plant at a cement facility.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.