Green Canyon Block 281 Well Hits 297 ft Of Net Oil Pay

Drilling Activity Details

Locations

United States

Operators
Post Date
Well Name
2SS (ST) OCSG33242
Geo Coordinate

Drilling Activity Summary

Description

Talos Energy LLC, based in Houston, announced details from a second well drilled on the company’s Green Canyon Block 281 project. The #2SS (ST) OCSG33242 hit 297 ft of net oil pay across two upper Miocene sands. A sidetrack was drilled to an estimated depth of 21,107 ft with a true vertical depth of 21,057 ft. Water depth in the area is 2,750 ft. Block 281 is the company’s Tornado development. The first well on the project, #1SS (ST) OCS G33242, was drilled to 20,755 ft in 2016 with production from an upper Miocene zone at 20,010-20,170 ft.