Optime Takes Giant Leap For Subsea Installation
The company’s subsea control and installation light system does not require a hydraulic umbilical from the support vessel, reducing both the cost and complexity of the topside structure.
Logging you in.
Logging you out.
Updating your account.
Based in London, Mark Venables has covered the energy and oil and gas sectors for more than 20 years. He had edited several magazines including Oil & Gas Technology, Engineering & Technology and Power Engineer as well as contributing to national newspapers, newsstand and trade publications.
The company’s subsea control and installation light system does not require a hydraulic umbilical from the support vessel, reducing both the cost and complexity of the topside structure.
E&P spoke with Scott Schmidt, vice president of drillbits for Baker Hughes, about the company's TerrAdapt adaptive drillbit.
© 2025 Hart Energy. All rights reserved. Reproduction in whole or in part, in any form or medium without express written permission is prohibited.